Search by Project Name
Projects by State
Author Archives: admin
Sunset Chev Stadium Renovation (Sumner School Dist.)
Description: a. heating, ventilation, and air conditioning, b. plumbing as described in RCW 18.106, c. electrical work as described in RCW 19.28, d. fire protection work as described in Section 210000 of the Project Manual; and e. any other categories … Continue reading
Lindbergh High School Improvements (Renton School District)
Description: This Project is for Improvements to Lindbergh High School. Improvements include but are not limited to: Construction of fire lanes, parking, storm drainage work, concrete pavement, landscaping and irrigation, site lighting, covered walk structures, kitchen upgrades, and exterior door … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
Gildo Rey Elementary School Improvements (Auburn School Dist. #408)
Description: Work includes, but is not limited to, demolition of a modular building, removal of underground fuel and septic tanks, replacement and expansion of parking lots, masonry repair and coating, refinishing of a wood gym floor, window coverings, kitchen improvements, a … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 22-Plumbing, 23-HVAC, 24-Telcom / Security, 26-Electrical, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
Graham Kapowsin High School Science Classroom Improvements (Bethel School District #403)
Description: The work includes upgrades to four existing science classrooms, conversion of two standard classrooms to science classrooms, transportation and electrical connection of a double portable classroom from an elementary school to the high school, conversion of an existing double … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
Early Childhood Learning Center (Renton School District No. 403)
Description: Construction of new Early Childhood Learning Center and related sitework. Work includes Demolition of Existing Building, Hazmat, Civil, Landscape, Architectural, Structural, Mechanical, Plumbing, Electrical, and Food Services improvements. Work shall be performed in phases. Bid Date (note new bid … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
Courthouse Generator Room Ventilation Project (Multnomah County)
Description: See Specs for complete details. Bid Date: 04-24-12 @ 2pm PT Walk Thru: N/A Price: Purchase Prints or Free File Download Refundable: No Project Contact: Kathi Braeme-Burr – Multnomah County Purchasing 503-988-5111, Extension 22596 kathi.braeme-burr@multco.us Addenda: To Be Determined … Continue reading
Posted in Oregon, Public Tagged 00-Procurement, 01-General, 15 Mechanical, 16-Electrical Leave a comment
Deschutes County Health Care Clinic (Sisters, OR)
Description: The project consists of constructing a one-story, approximately 2600-square-foot facility that will be operated as a school-based health care center. Interior spaces include medical exam rooms, dental operatories, laboratory, counseling offices, patient waiting area, and conference room. The facility … Continue reading
FEMA Alternate Project Roadway Improvements Project – ( Port of Tillamook Bay, Tillamook, Oregon)
Description: 1. Furnish and construct 43,800 square yards of full depth roadway reclamation. 2. Furnish and install 18,520 Tons of Level 3 ½” Dense HMAC paving. 3. Furnish and install 160 linear feet of concrete railroad crossings. 4. Construct 19,970 … Continue reading
Skyview Junior High School Tenant Improvements (Northshore School District #417)
Description: 1. Modifications to teacher planning rooms. 2. Installation of movable partition and modifications to choir room and adjacent commons space. 3. Modifications to the science prep room to create additional teacher planning space. 4. Miscellaneous finish and casework modifications … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 21-Fire Suppression, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
Marysville K-8 Insurance ReBuild – Bid Package (Portland Public Schools)
Description: Rebuilding of the existing burned portion (approximately 20,000 s.f.) of the Marysville School; b. Ground up construction to replace the 2,600 s.f. gymnasium which was burned to the ground; c. Miscellaneous minor remodeling of approximately 5,000 s.f. within the … Continue reading
Posted in Oregon, Public Tagged 00-Procurement, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
Hood River Ranger Station – Remodel
Description: This project consists of remodeling approximately 1140 square feet of an office building and adding approximately 500 square feet to the building. The site work includes, but is not limited to, removal of existing vegetation, pavement, and general site preparation. … Continue reading
Posted in Oregon, Public Tagged 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 12-Furnishings, 20-Mechanical, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments Leave a comment
09346-SH55, Payette RV Br S to Payette RV (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of CRABS/Overlay North & South of Cascade and reconstruct where curb & gutter exist on SH-55, MP 113.9 to MP 115.89; SH-55, Payette Rv Br S to Payette Rv Br N, … Continue reading
Posted in Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
12078-SH25 Main St & Tiger Dr, Jerome Co (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of signalizing the intersection of SH-25, Main St & Tiger Dr including, urban approaches, sidewalk, and curb & gutter; SH-25 Main St & Tiger Dr, Jerome Co, known as Idaho Federal Aid … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
09558-I-15 Pancheri Dr Upass NR Idaho Falls (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of constructing a four lane structure over 1-15 and reconstructing Pancheri Drive from Blue Sky Drive to Utah Ave including, illumination, sidewalk, curb & gutter, traffic signal, and storm water drainage; … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
Lagoon 3 Bird Netting System (Port of Seattle Poject – MC-0317213)
Description: The Work includes: The installation of a bird netting system that spans and covers Lagoon 3 near 188th Street at Seattle-Tacoma International Airport. The bird netting system includes, but is not limited to, concrete foundations, steel posts, counter-weight systems, … Continue reading
Posted in Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 09-Finishes Leave a comment
Bethel & Spanaway Lake HS Science Classroom Improvements (Bethel School District #403)
Description: The Work consists of: Renovations to existing Science classrooms at Bethel High School and Spanaway Lake High School with modifications to existing electrical, mechanical and fire sprinkler systems. Construction Type for Bethel High School is Type V-A fully sprinkled … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
Covered Play Structures for Cascade & Maplewood Heights Elementary Schools (Renton School Dist #403)
Description: This Project is for construction of Covered Play Structures at Cascade and Maplewood Heights Elementary Schools. Improvements include construction of play area structures, installation of athletic equipment, pavement, stonn drainage work, and miscellaneous improvements. Estimated Project Cost: $700,000 – … Continue reading
Mountain View High School Fire Sprinkler (Bend-LaPine School Dist.)
Description: 1. Administrative School District #1 is providing: Complete the fire sprinkler system, approximately 121,350 square feet. 2. The Contractor shall provide for all scheduling, coordination, cutting and patching and all other items required by the contract Documents to complete … Continue reading
Posted in Oregon, Public Tagged 00-Procurement, 01-General, 07-Thermal & Moisture, 09-Finishes, 15 Mechanical Leave a comment
Cascade Middle School Fire Sprinkler (Bend – La Pine School Dist.)
Description: Administrative School District #1 is providing: Complete the fire sprinkler system, approximately 94,000 square feet. Bid Date: 04-12-12 @ 1:30pm PT Walk Thru: 03-27-12 @ 2:30pm PT - MAP Price: Printed Sets on Deposit or Free File Download Deposit … Continue reading
Posted in Oregon, Public Tagged 00-Procurement, 01-General, 07-Thermal & Moisture, 09-Finishes, 15 Mechanical Leave a comment
OAME Edenbower Boulevard at Aviation Drive Traffic Signal Improvements – Phase II (City of Roseburg, OR)
Description: Construction of Aviation Drive at the intersection with Edenbower Boulevard to improve the existing vertical curve and provide a right turn lane. Installation of 630 lineal feet of monolithic curb and sidewalk (including demolition of existing). Improvement of existing … Continue reading
Posted in Oregon, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
PW12-0083F – Stadium Way Arterial Project (City of Tacoma)
Description: This Contract provides for the improvement of pavement, street lighting, sanitary sewer, storm sewer, and other utilities, handrails and sidewalks with improvements to ADA accessibility, a new traffic signal system at North 4th, traffic signal upgrades at the 1-705 … Continue reading
Central Park ADA Modifications (Washington State Department of Transportation)
Description: The work of this project will be performed at the Central Park Maintenance and PE Office and includes ADA improvements to the site and building entry vestibule. Bid Date: 04-11-12 @ 11am PT Walk Thru: 03-28-12 @ 2pm PT … Continue reading
Concourse D Common Use Enviroment Proj #104421 (Port of Seattle)
Description: The Work includes: installation of up to eleven (11) gates of common use passenger processing equipment and infrastructure, new casework, carpet, wall coverings, installation of POS provided seating, task lights and furnishings, and other associated work on Concourse D. … Continue reading
12044-SH55 Eagle Rd, Fairview Ave. to SH44 (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of milling existing pavement, plant mix pavement overlay, installation of video detection equipment at existing traffic signals, signing, and reconstructing existing urban approaches (ADA ramps); SH-55 Eagle Rd; Fairview Ave to … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
13038-I84, FY12 D3 Bridge Deck Rehabs, Elmore & ADA Co (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of rehabilitating bridge decks at various locations along 1-84, including restoring crossovers on each side ofthe US-20 lC and thin lift overlay on I-84B/US-20, MP 95.26 to MP 96.0; 1-84, FYI2 … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
12985-I-90 FY12 Bridge Repairs (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of bridge deck sealing, bridge rail & sidewalk waterproofing, guardrail upgrade, repairing concrete piers & girders, and upgrading bridge joints; 1-90 FY12 Dl Bridge Repairs, known as Idaho Federal Aid Project … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
Alpac Elementary School Improvements (Auburn School District)
Description: The scope of work includes limited improvements to an existing wood framed elementary school building. Work includes, but is not limited to, modifications to an existing playshed, partial roofing replacement, athletic equipment, replacement of a gymnasium floor, window coverings, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 28-Elect.Saftey-Security, 32-Exterior Improvments Leave a comment
Petco Interbay Seattle, WA (Curt Faus Corp.)
Description: The project is a 15,000 sf Petco Retail tenant improvement to an existing shell. Scheduled start date is mid-April, 2012. Subcontractor must be licensed in the state of Washington. Work as shown on bid documents but not limited to Concrete, … Continue reading
Fortson Creek Culvert – Fish Barrier (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** SR 530, MP 42.91 to MP 43.05 in Snohomish County, Fortson Creek Culvert – Fish Barrier, by removing existing corrugated arched pipe, creek channel build up, clearing and grubbing, excavating, grading, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings Leave a comment
Clear Creek Falls-Rimrock Tunnel Vicinity-Stablize Slopes (Washington State Dept of Transportation)
Description: This Contract provides for the improvement of *** unstable slopes on US 12 between MP 154.31 to MP 154.41 and MP 164.95 to MP 165.06 in Yakima County, by clearing, rock slope scaling, debris removal, installing rock bolts and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Eagle Harbor Maintenance Facility Slip E Mech Rehab & Seismic Retrofit (Washington State Department of Transportation)
Description: This contract provides for ***repairing Slip E transfer span structural deficiencies, replacing bridge control panel, replacing apron hoist system and hinges, apron counterweight system, replacing bridge hoist and counterweight sheaves, replacing the hoist and counterweight cable connection to the … Continue reading
Posted in Public Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings, 10-Specialties, 11-Equipment, 12-Furnishings Leave a comment
US 101 Overcrossing Seismic Retorfit (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** Bridge.s No. 8/104N & 8/104S on SR 8, MP 20.6 vicinity and Roadway Work on US 101, MP 361.4 vicinity, in Thurston County, by installing column jackets and performing other bridge … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
176th ST SE VIC To SR 96 Paving (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** SR 9, M.R 4.03 to M.P. 6.89 in Snohomish County, 176TH ST SE VIC TO SR 96 – PAVING, by planing bituminous pavement, paving with hot mix asphalt, traffic induction loops, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 05-Metals, 08-Openings, 09-Finishes Leave a comment
Bothell Community Church (Jansen Construction Co.)
Description: Ground up construction of an 80,406sf addition to the existing church. Three-story steel and light gauge metal frame construction. Steel truss. Vertical corrugated metal and split face cmu siding. Metal and single ply roofing. Vinyl windows. Associated site improvements. … Continue reading
UW – Fisheries Teaching & Research Building Envelope Improvements (University of Washington)
Description: The project includes the following work: site demolition including paving, stairs, landscaping, and site furnishings; excavation and backfill at the building foundation; shoring; a new storm drainage system; landscape restoration, including irrigation and site furnishings; demolition and replacement of … Continue reading
Eastern Region Chip Seal 2012 (Washington State Department of Transportation)
Description: This contract provides for the improvement of: 13.10 miles of US 2 in Lincoln County, MP 207.78 to 220.88;1 24.20 miles of SR 21 in Adams and Franklin Counties, MP 0.00 to 24.20; 21.57 miles of SR 26 in … Continue reading
Simpson Ave Bridge Remaining Pier 2 Stabilization (Washington State Department of Transportation)
Description: This contract provides for the improvement of *** US 101, by repairing the Hoquiam River (Simpson Avenue) Bridge No. 101/125W and one sidewalk location *** and other work, all in accordance with the attached Contract Plans, these Contract Provisions, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Bristol Fill Bridge Deck Replacement (Washington State Department of Tranportation)
Description: This Contract provides for the improvement of *** SR 10, MP 90.06 to MP 90.22, in Kittitas County, by removing portions of an existing bridge, fabricating, erecting and painting steel girders, forming, casting and curing a reinforced concrete bridge … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 02-Existing Conditions, 04-Masonry, 05-Metals, 06-Wood & Plastics, 08-Openings Leave a comment
SR 18 Interchange WB Bridge (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** I-90, in King County, MP 25.30 to 26.02, SR 18 Interchange WB Bridge, Bridge Deck Rehabilitation, by rehabilitating the existing I-90 WB bridge deck (Br. 90/78N), reconstructing bridge expansion joints, planing, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 08-Openings Leave a comment
Mounts Rd Vicinity to Berkley St. (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** I-5 in Pierce County, MP 116.70 to MP 122.13, I-5, Mounts Road Vicinity to Berkeley St – Median Barrier Replacement, by installing precast concrete median barrier, guardrail, traffic control, *** and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Crosstown Pipeline Upper Reach Repair (City of Bremerton, WA)
Description: The work to be completed under this Contract generally consists of installing approximately 2400 feet of 36-inch diameter high-density polyethylene (HDPE) sewer main, rehabilitating 880 feet of 30-inch ductile iron sewer main with cure-inplace pipe (CIPP) technology, installing 700 … Continue reading
Evergreen Campus Teen Health Clinic (Healthpoint Community Health Centers)
Description: The work involves interior modifications to Building 200 at Evergreen Campus, originally constructed in 1954. The work includes, but is not limited to: demolition of existing interior partitions and finishes, slab cuts to run new plumbing, construction of new … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
12915-SH16 Boise RV Bridge N (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of realignment of 1.00 mile ofSH-16, MP 98.98 to MP 99.98, including concrete pavement with superpave plantmix asphalt leveling course, gravel access roads, drainage & irrigation improvements, a box culvert, and … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
Protected: Verona Lots 02, 14 & 15 & Mondavio Lots 11, 12 & 15
There is no excerpt because this is a protected post.
Posted in Cosmos Development Co., Private Enter your password to view comments.
13037-13039-I84 Boise RV Bridges, Caldwell & I84 Black Canyon (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of rehabilitating bridge decks at 1-84, Black Canyon IC Exit13; Exit 27 EB Off Ramp; Exit 27 WB On Ramp; 1-84 over Boise River, MP 26.9 & Centennial Way over 1-84, … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
11051-11565-SH51 Sheep Cr Rd to Tindall Rd (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of installing a Bituminous Surface Treatment on SH-51, MP 19.889 to MP 28.915 and MP 28.915 to MP 33.710; SH-51, Sheep CrRd to Tindall Rd, Owyhee Co and SH-51, Tindall Rd … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
OAME Wanell to Luth Storm Drain Improvements (Roseburg, OR)
Description: The proposed work generally consists of furnishing all labor, equipment, materials, and supervision for the construction of approximately 2,700 feet of storm sewer pipe, 220 feet of curtain drain, 8 catch basins with filters, 12 large manholes, and 65 … Continue reading
Foss Superstructure Repairs
Description: Work includes but is not limited to the following: 1. Shoreline Community College – 5000 Building Improvements, FOSS Superstructure Repairs. 2. Demolition of existing concrete ramp, stair, landings and associated structure at southern entry of the 5,000 FOSS Building. … Continue reading
12013-State FY13, D2 Distwide Sealcoats (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of seal coating portions ofSH-3, SH-6, SH-9, SH-13, US-12, & US-95 in District 2; State, FY13, D2 Distwide Sealcoats, known as Idaho Project No. A012(013), in Clearwater, Idaho, Latah, Lewis, & … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
Lighting Efficiency Deferred Maintenance (Multnomah Co. B12-10681)
Description: Partial lighting renovation of (11) Multnomah County Facilities & Property Management buildings. Scope of work includes delamping, relamping/reballast and installation of retrofit kits throughout all (11) buildings. The scope also includes minor Architecrual ceiling modifications to the 3rd, 5th … Continue reading
Posted in Oregon, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 05-Metals, 09-Finishes, 16-Electrical Leave a comment
PW12-0027 Tacoma Landfill Stage 3 Closure- Central Area Ph 3
Description: This contract shall generally consist of closing an approximately 7 acre area of the Central Area of the Tacoma Landfill with an impermeable geosynthetic clay liner and a HDPE geomembrane. Installation of new landfill gas system piping and extraction … Continue reading
Edison Elementary School Playground Improvements – Phase 2 (Tacoma School Dist)
Description: The Work generally includes, but is not limited to the following: a. Site Work and Site Demolition: Demolition of existing paving, curbs, utilities and site features. Site clearing, grading and earthwork. Site paving, curbing, utility work, landscaping and irrigation, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 12-Furnishings, 22-Plumbing, 26-Electrical, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
City of Lacey Senior Center Expansion
Description: The major items of work include furnishing all materials, equipment, tools, labor, and other items incidental thereto for all the work necessary to complete the construction of approximately 5388 s.f. of new construction, and 5072 s.f. of existing building … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments Leave a comment
2011 Olympic Region Basic Safety Restoration (WSDOT-11C504)
Description: This Contract provides for the improvement of SR 8, SR 99, US 101, SR 165, and SR 167 in Clallam, Grays Harbor, Mason, Pierce, and Thurston counties by removing beam guardrail, guardrail anchors, and flexible guide posts, clearing and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 08-Openings, 09-Finishes Leave a comment
Orcas Island Ferry Terminal Trestle Paving (WSDOT)
Description: This Contract provides for the improvement of SR 20 Spur Orcas Ferry Terminal, in San Juan County, Washington by removing and replacing the asphalt cement pavement on the timber trestle and other work, all in accordance with the attached … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings Leave a comment
OAME Redmond High Desert
Description: New Trail installation in The Dalles Oregon Bid Date: N/A Walk Thru: N/A Price: Purchase Prints or Free File Download Refundable: No Project Contact: Architect Addenda: To Be Determined Host: ARC-Portland (503) 227-3424 View / Order This Bid Project … Continue reading
Posted in Oregon, Public Leave a comment
Exterior Gates and Airfield Improvement Projects (Port of Seattle)
Description: The Work includes:A. Apron Pavement Replacement – Work includes removal and replacement of Portland cement concrete paving (PCCP) panels at various locations throughout the apron. Fuel Hydrant System and Docking Guidance System Additions – Install nine (9) new fuel … Continue reading
Montlake & Thornton Creek 2012 Upgrades Re-Bid (Seattle School Dist #1)
Description: The work will include, but not be limited to, (Montlake) roofing, and (Thornton Creek) fire alarm and emergency lighting. The cost range is $300,000 to $400,000. Bid Date: 03-27-12 @ 2pm PT Walk Thru: 03-06-12 @ 2pm PT - … Continue reading
11207-FY12 Dynamic Message Signs (Idaho Transportation Dept)
Posted For Informational Purposes Only Description: for the work of installing six Dynamic Message Signs, including signs, posts, foundations, electronic equipment cabinets, power and communication connections at six locations in District 1, District 6, and West Yellowstone, Montana; State, FY … Continue reading
Posted in Idaho, Public Tagged 00-Procurement, 01-General, 02-Existing Conditions, 16-Electrical Leave a comment
Replace North Main Terminal & Fire Station Roof Systems (Port of Seattle)
Description: The Work includes: Remove existing roofing which contains asbestos materials on the Fire Station at Seattle-Tacoma International Airport and replace with a fully adhered elastomeric roofing system. The Engineer’s estimate range for this project is $300,000 – $750,000 Bid … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 06-Wood & Plastics, 07-Thermal & Moisture Leave a comment
Spokane Area Demolition (12Z010 – WSDOT)
Description: This contract provides for the improvement of *** WSDOT owned properties within the City of Spokane at 3911 S. Inland Empire Way, 4218 E. 2nd, 4014 E. 3rd, 3120 E. Garnet and 4020 N. Market by abatement of asbestos … Continue reading
Port Townsend Ferry Terminal Slip 1 Transfer Span Fabrication (09W152-WSDOT)
Description: This Contract provides for the improvement of *** SR 20 Port Townsend Ferry Terminal by fabricating one steel ferry terminal hydraulic transfer span, concrete bridge seat, furnishing piling, furnishing casing *** and other work, all in accordance with the … Continue reading
Posted in Public, Washington Tagged 01-General, 06-Wood & Plastics, 08-Openings, 11-Equipment Leave a comment
1Mile E of NEFF Rd. to Old Bnnr Bridge – Paving (11Y017 – WSDOT)
Description: This Contract provides for the improvement of *** SR 124 in Walla Walla County, MP 17.61 to MP 22.62 by planing bituminous pavement, paving with HMA, fog sealing, crack sealing, pavement markings, guardrail work, permanent signing, traffic control, *** … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 08-Openings, 09-Finishes Leave a comment
SR20 & SR525 Vehicle Reservations Phase 1 ITS Systems (WSDOT – 11A017)
Description: This Contract provides for the improvement of SR 20 in Jefferson County, MP 8.00 to MP 12.55, in Island County, MP 12.88 to 28.69, in Skagit County, MP 49.50 to 50.60, and SR 525 in Island County, MP 27.46 to … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings Leave a comment
Asa Mercer Middle School | School Based Health Center
Description: The work involves interior and minor exterior modifications to Asa Mercer Middle School, originally constructed in 1956. The work includes, but is not limited to: demolition of existing interior 4” CMU partitions, slab cuts to run new plumbing, construction … Continue reading
Albertsons #465 Remodel – Lakewood, WA (Curt Faus Corp.)
Description: Work as shown on bid documents but not limited to Concrete, Steel/Metals, Gypsum, Finishes, Plumbing, Fire Sprinkler, HVAC, Electrical. Project Address: 8611 Stellacoom Blvd., SW, Lakewood, WA - MAP UPDATED-Bid Date: 03-14-12 @ 12pm PT Walk Thru: N/A Price: … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 13-Special Construction, 15 Mechanical, 16-Electrical Leave a comment
104th St East and 199th/200th Ave Ct East Intersection Improvements (Sumner School District No. 320)
Description: Improvement of the 104th Street E and 199th/200th Ave Ct E intersection by widening the roadway to provide left turn lanes on 199th/200th Ave Ct E and by installing a fully actuated traffic signal system. This work includes, but … Continue reading
113th Ave SW Bridge Special Repair (WSDOT)
Description: This Contract provides for the improvement of 1-5 in Thurston County, MP 97.22 to MP 97.23, 113th Ave SW Bridge – Special Repair, by removing and replacing one existing prestressed concrete girder, reconstructing associated bridge superstructure items including bridge … Continue reading
Posted in Public, Washington Leave a comment
Village at Main Street (VMS) – Entrance Remodel (Wilsonville, OR)
Description: Village at Main Street – Entrance Remodel, 30050 SW Town Center Loop Suite 200, Wilsonville OR Bid Date: N/A Walk Thru: N/A Price: Purchase Prints or Free File Download Refundable: No Project Contact: Scott Watt @ Marathon Construction Services … Continue reading
Posted in Oregon, Public Leave a comment
Protected: Weymouth Residence
There is no excerpt because this is a protected post.
Posted in Private, Taylor Construction Mgmt. Enter your password to view comments.
Sound Transit South Link Project Sea-Tac/Airport Station to South 200th St. (Kiewit Construction)
The Kiewit team requests responses from interested subconsultants, subcontractors and suppliers including: Disadvantaged Business Enterprises and Small Business Enterprises listed and certified by OMWBE for DBE’s and the OMWBE, SBE, other public agency or contractor/self-certified for SBE’s for the following … Continue reading
Posted in Kiewit Construction, Public Leave a comment
Protected: Clyde Revord Buick GMC Dealership – Everett, WA
There is no excerpt because this is a protected post.
Posted in Hecker Architects, Private Tagged 00-Procurement, 01-General, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 15 Mechanical, 22-Plumbing, 23-HVAC, 26-Electrical, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Enter your password to view comments.
Protected: Seattle Aquarium – Pier 60 Concrete & Corrosion Repairs
There is no excerpt because this is a protected post.
Posted in Private, Seattle Aquarium Enter your password to view comments.
Protected: Gamblin Chevrolet & Buick
There is no excerpt because this is a protected post.
Posted in Hecker Architects, Public Tagged 00-Procurement, 01-General, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 15 Mechanical, 22-Plumbing, 23-HVAC, 26-Electrical, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Enter your password to view comments.
Bremerton Housing Authority – Bay Vista West Project in Bremerton, WA
Description: Work includes, but is not limited to the following: 1. Excavation, compacted and uncompacted backfilling, grading, shoring, drainage, etc. 2. Concrete and asphalt walks, curbs, paving, etc. 3. Landscaping and landscaping irrigation 4. Concrete slabs and foundations 5. Framing, … Continue reading
Protected: Pierre Chevrolet – Lake City, WA (Click Here)
There is no excerpt because this is a protected post.
Posted in Hecker Architects, Private Enter your password to view comments.
Protected: Renton School Dist. – Secondary Learning Center
There is no excerpt because this is a protected post.
Posted in Neeley Construction, Private Enter your password to view comments.
Protected: Mondavio & Verona
There is no excerpt because this is a protected post.
Posted in Cosmos Development Co., Private Enter your password to view comments.
Protected: Bethel Animal Hospital – Bethel, WA
There is no excerpt because this is a protected post.
Posted in Architectural Werks, Private Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 13-Special Construction, 15 Mechanical, 16-Electrical Enter your password to view comments.



