Willow Lake Drive Upgrade
06-04-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Matanuska-Susitna Borough is soliciting bids from qualified contractors to provide labor, equipment and material to reconstruct approximately 9,836 linear feet of Willow Lake Drive, Lakeshore Drive, Stormybrook Drive, and Sunnybrook Way near Mile 69 Parks Highway, Willow Alaska. This project will upgrade the existing gravel roadways to MSB residential road standards. This work will involve, but is not limited to 0.8 acres Clearing and Grubbing, 8,759 CY Unclassified Excavation, 13,738 CY Borrow, Type A, 6,292 tons Aggregate Base Course, Grading D-1, and 2,918 tons Asphalt Concrete, Type II, Class B. Additional items include drainage improvements,...
ADA Improvements at Chugach Manor Housing Complex
06-13-2013
05-28-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Modify the living units, common areas, entry areas, and routes of travel to bring Units A 101, A 102, A 103, B107, D107, and D109 into ADA compliance. Bid Date: 6/13/13, 2:00 pm local time Pre-Bid Meeting: 5/28/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Greg Rochon, (907)330-8191, submittals@ahfc.us Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: ADA Improvements at Chugach Manor Housing Complex Seattle Daily Journal of Commerce – (Plan Center) Contact:...
Crawl Space Mechanical Upgrades at Parkview Manor Housing Complex
06-06-2013
05-24-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work shall include furnishing all labor, materials, equipment, supervision of labor, and performance of all operations required to completely install satisfactorily operating mechanical and plumbing systems as defined in the Technical Specifications and on the Drawings. Major items of work include, but are not limited to, the installation of the following systems: 1) water supply system, and 2) plumbing. Bid Date: 6/6/13, 2:00 pm local time Pre-Bid Meeting: 5/24/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Greg Rochon, (907)330-8191, submittals@ahfc.us Addenda: To Be...
Soldotna Police Department Roof Replacement
06-04-2013
05-23-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Remove existing inverted roof membrane assembly (IRMA) and install a new ethylene propylene diene monomer (EPDM) rubber roof assembly per plan and specifications. New installation includes framing, flashing, finishing insulation, mechanical, drainage and electrical. Removal of existing roof will include salvage and delivery of selected roof materials per plans and specifications. Bid Date: 6/4/13, 3:00 pm local time Pre-Bid Meeting: 5/23/13, 10:00 am local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: k.kornelis@ci.soldotna.ak.us Addenda: To Be Determined Download PDFs Place Print...
Eagles Edge Subdivision Water System Improvements, Phase I – LID 97
05-28-2013
05-17-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This Project consists of reconstruction of Chatham Drive. The WORK consists of installation of new water and storm drainage systems, some sanitary sewer reconstructions, curb and gutter, replacement of the roadway embankment to a depth of 24 inches, shot rock borrow, shot rock with base course, new asphalt pavement, paved sidewalk, and miscellaneous related WORK. Bid Date: 5/28/13, 2:00 pm local time Pre-Bid Meeting: 5/17/13, 10:00 am local time - CBJ Engineering Department, 3rd Floor Conference Room, Marine View Center - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Jennifer Mannix, (907)...
Taku Dock Reconfiguration
05-29-2013
05-15-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This WORK for this project consists of all activities necessary to construct the Taku Dock reconfiguration project as shown in the contract documents. The WORK is generally described as all activities necessary to demolish a portion of the existing Taku Dock, drive piles and expand existing dock, install concrete deck, install new fender piles, reinstall ladders, relocate existing crane, connect electrical power to the relocated crane, and other related work as shown on the plans. Bid Date: 5/29/13, 2:00 pm local time Pre-Bid Meeting: 5/15/13, 10:00 am local time - CBJ Engineering Department, 3rd Floor Conference Room, Marine View Center...
Sand and Pipe Storage Buildings
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of one each new sand storage building and one each new pipe storage building including all structural, mechanical, electrical, civil work associated with the project and other related work. Bid Date: 5/22/13, 3:00 pm local time Pre-Bid Site Visit: 5/13/13, 2:00 pm local time or 5/14/13, 10:00 am local time - 8501 Hesterburg Rd, MAP Pre-Bid Meeting: 5/14/13, 1:30 pm local time - MAP Estimated Cost: $500,000 - $1,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: wwpur@muni.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders...
Vehicle Maintenance Facility (Kenai, AK)
05-29-2013
05-22-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construct a new 17,000 sq ft vehicle maintenance facility. Bid Date: 5/29/13, 10:00 am local time Pre-Bid Meeting: 5/22/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: PublicWorks@ci.kenai.ak.us Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Vehicle Maintenance Facility (Kenai, AK) Eric’sons Trench Drain – (Other) Contact: Jason Caneer Address: Eric’sons 574C Industrial Way N Dallas, GA 30132 Contact by: P.8135046145 F. 7705056110 E....
Bragaw Reka Drive Water & Sewer Rehabilitation
05-21-2013
05-14-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: SCHEDULE A: Consists of the installation of approximately 837 linear feet of contractor furnished and installed 8-inch ductile iron pipe, Class-52, external zinc coating water main, 211 linear feet of 6-inch ductile iron pipe, Class-52, external zinc coating water main, five (5) 8-inch gate valves, six (6) 6-inch gate valves, two (2) single pumper fire hydrants, furnishing and installing two (2) single pumper fire hydrants, furnishing and installing two (2) I-inch plastic coated Type K copper water service lines and key boxes, all related appurtenances, temporary water system, and the restoration of affected streets and improvements. Work includes removal...
Bar Harbor Drive Down Float Facility – Ketchikan, AK
06-04-2013
05-21-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Work generally consists of demolition and disposal of existing moorage floats, refurbishment and relocation of an existing timber net float, construction of an approach dock, transfer bridge, drive down float, steel pipe pile installations, predrilled pile sockets, water service, electrical and lighting improvements and other associated improvements. Bid Date: 6/4/13, 2:00 pm local time Pre-Bid Meeting: 5/21/13, 10:00 am local time - Public Works conference room, MAP or teleconference - (907) 247–4009, PIN: 18378 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Port & Harbors office, (907)...
Mears Middle School CTE, Store, & Admin Upgrades
05-24-2013
05-10-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of interior renovation of the Administration area, Career and Technology Education Classroom and the School Store at Mears Middle School. The Administration renovation will allow staff to see all incoming visitors as well as create a direct entrance to the school office. A computer lab will be added within the existing shop as well as improving electrical circuiting and mechanical ventilation. Lastly, the school store will get demolished in its entirety and replaced with a larger store with greater electrical capacity and running water. Bid Date: 5/24/13, 2:00 pm local time Pre-Bid Site Visit: 5/10/13, 4:00 pm local time -...
Capital Improvement Projects – Stephens Drive and Rensselaer Lane, Baylor Street & Jefferson Avenue
05-16-2013
05-08-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Subgrade modification including fill and backfill. Culvert installation, geotextile installation, clearing and ditching, roadbed widening. Bid Date: 5/16/13, 4:00 pm local time Pre-Bid Meeting: Rensselaer Lane: 5/8/13, 10:00 am local time - MAP Stephens Drive: 5/8/13, 10:30 am local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Kenai Peninsula Borough Road Service Area Office, (907) 262-4427 Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the...
Mountain View Boys and Girls Club HVAC Unit Replacement
05-16-2013
05-08-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of replacement of six (6) HVAC rooftop units. Additive Alternate #1 consists of replacement of two (2) additional HVAC rooftop units and other related work. Bid Date: 5/16/13, 2:30 pm local time Pre-Bid Meeting: 5/9/13, 3:30 pm local time - Suite 520, MAP Pre-Bid Site Visit: 5/8/13 or 5/9/13, 10:00 am local time - MAP Estimated Cost: $100,000 - $500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: wwpur@muni.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Mountain View Boys and Girls Club...
Senate District O Road Rehabilitation Project Area 2
05-15-2013
05-08-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of approximately 860 S.Y. of sidewalk and concrete apron removal and replacement; 6 curb ramps; 3,500 L.F. of curb and gutter removal and replacement; 5,700 tons of A.C. pavement; 41,500 S.Y. of pavement reclamation; 5 speed humps; and other related work. Bid Date: 5/15/13, 2:00 pm local time Pre-Bid Meeting: 5/8/13, 3:00 pm local time - Suite 520 MAP Estimated Cost: $1,000,000 - $3,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: wwpur@muni.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders...
Senate District M Road Rehabilitation, Area 2
05-15-2013
05-08-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of approximately 1,800 L.F. of curb and gutter removal and replacement; 2,600 tons of A.C. pavement; 20,700 S.Y. of pavement reclamation; 2,600 S.Y. of pavement removal; and other related work. Bid Date: 5/15/13, 3:00 pm local time Pre-Bid Meeting: 5/8/13, 3:30 pm local time - Suite 520 MAP Estimated Cost: $500,000 - $1,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: wwpur@muni.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Senate District M Road Rehabilitation, Area 2 Seattle...
Mat-Su Day School
05-20-2013
05-02-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Matanuska-Susitna Borough is soliciting bids from qualified contractors to provide labor, equipment and material to construct the new Mat-Su Day School at 3901 E. Bogard Rd in Wasilla Alaska. The school is approximately 21,500 SF housing K-12 students consisting of ten classrooms, multipurpose room, administrative areas, parking lots, access roads, field, and playground. Contractors will be responsible to construct the facility per the drawings and specifications provided in the bid documents. Bid Date: 5/20/13, 3:00 pm local time Pre-Bid Meeting: 5/2/13, 10:00 am local time - P2 Purchasing Conference Room MAP Price: Purchase Prints or Free File...
Valley Pathways School Construction
05-22-2013
05-09-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Work includes construction of a new single story school of approximately 46,475 square feet with one 2nd level fan room as identified in the contract specifications and drawings. Bid Date: 5/22/13, 3:30 pm local time Pre-Bid Meeting: 5/9/13, 1:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: McCool Carlson Green Architects, (907) 563-8474 Addenda: To Be Determined Download PDFs Place Print Order View Plan Holders List Plan Holders List: Valley Pathways School Construction Seattle Daily Journal of Commerce – (Plan Center) Contact:...
Multipurpose Room Flooring Replacement – Five Schools Mat-Su Borough
05-20-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The scope of work for this project consists of removal and replacement of multipurpose room flooring systems in five different Matanuska-Susitna Borough schools. The five schools are Tanaina Elementary, Finger Lake Elementary, Cottonwood Creek Elementary, Snowshoe Elementary, and Butte Elementary Schools. The existing flooring systems are vinyl composite tile with rubber cove base. The replacement flooring systems are a resilient athletic flooring system. Some of these buildings will require abatement of regulated materials. The Contractor shall provide all equipment, materials, labor, supervision, miscellaneous supplies, permits, authorizations/notifications,...
Central Peninsula Hospital Obstetrics, Infusion Wound Care Departments Renovations
05-07-2013
04-30-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Approximately 2600 square feet of renovation, window replacement, medical gas system upgrades, and other minor improvements in various locations inside of the Central Peninsula Hospital. UPDATED Bid Date: 5/8/13, 2:00 pm local time Pre-Bid Meeting: 4/30/13, 10:00 am local time - KPB Conference Room, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: John Hedges, (907) 262-9657 Addenda: To Be Determined Download PDFsDownload Addendum No. 1Download Addendum No. 2 Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you...
Berths I and II Rehabilitation – Phase III
05-17-2013
04-25-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of all work necessary for the Berths I and II Rehabilitation – Phase III project. Specific items of work include demolition and disposal of an approximately 30,000 square foot existing timber dock; salvage of existing items and piles; construction of an approximately 30,000 square foot dock consisting of installation (driving and / or drilling for anchoring) of 20 inch diameter steel pipe piles, steel pile caps supporting precast concrete deck panels and cast in place deck, sidewalks, utilities and electrical systems. The construction of three, approximately 120 square foot wood framed covered canopies is also included in this...
Abbott Loop Elementary School Roof Repairs
05-01-2013
04-16-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Remove all existing LightGuard (LG) insulation panels from the roof on approximately 27,400 square feet of roof areas identified as roofs E and J. Contractor shall be responsible to provide a transition plan during this removal work to prevent wind loss or damage to the exposed membrane. Once LG is removed power wash existing EPDM membrane surface to remove dirt and grime to allow for thorough inspection. Provide appropriate protection at the drains to prevent debris from being swept into the drains. Inspection team will consist of representatives from the contractor, the Owner and the architect to confirm final scope of repairs. Provide three (3) days...
Weller Elementary School Septic Replacement (Fairbanks)
04-25-2013
04-12-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work consists of, but is not necessarily limited to construction of a new septic system to include septic tank manholes, leachfield and associated piping, new drains, an related features. Bid Date: 4/25/13, 2:00 pm local time Pre-Bid Meeting: 4/12/13, 10:00 am local time - Chizmar Room MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: purchasing@fnsb.us Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this...
Gladys Wood Elementary School Building Upgrades
04-25-2013
04-10-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: See plans & specs for complete description. Bid Date: 4/25/13, 2:00 pm PST Pre-Bid Site Visit: 4/10/13, 4:00 pm PST - MAP Pre-Bid Meeting: 4/11/13, 10:00 am PST - MAP Estimated Cost: $500,000 - $1,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Purchasing@asdk12.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message. Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...
Tudor Elementary School HVAC Upgrades
04-22-2013
04-08-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Replace the boilers and associated equipment in the boiler room. Select replacement of some hydronic systems in the building. Replace the air handling units in the multi-purpose room. Retrofit the exhaust air in the main office. Other work as described in the project documents. Bid Date: 4/22/13, 3:00 pm local time Pre-Bid Meeting: 4/9/13, 11:00 am local time - MAP On-Site Pre-Bid Meeting: 4/8/13, 4:00 pm local time - MAP Estimated Cost: $100,000 - $500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Purchasing@asdk12.org Addenda: To Be Determined View/Download PDFs Place Print...
Sitka Community Hospital Roof Replacement
04-12-2013
04-03-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of providing all materials, equipment, transportation, and labor necessary for the Sitka Community Hospital Roof Replacement. The scope of work includes, but is not limited to: demolition of the existing roof assembly, abatement of all regulated materials, furnishing and installation of an 80-mil fully adhered reinforced PVC membrane over fully adhered cover board and fully adhered rigid insulation. Specific scope of work is indicated on the drawings and in the specifications. Bid Date: 4/12/13, 2:00 pm local time Pre-Bid Meeting: 4/3/13, 2:00 pm local time - 3rd Floor Conference Room, MAP Price: Purchase Prints or Free File...
Sears-Kaleidoscope & Soldotna Elementary Schools Roof Replacement
04-23-2013
04-10-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Removing / replacing built-up roofing at Sears-Kaleidoscope Elementary and Soldotna Elementary schools. Built-up roofing to be (contractor’s choice) Option A – 5-ply Type III BUR or Option B – 3-ply SEBS per plans and specifications including framing, flashing, finishing insulation, mechanical drainage and electrical. Bid Date: 4/23/13, 2:00 pm local time UPDATED Pre-Bid Meeting: 4/10/13, 10:00 am local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: purchasing@borough.kenai.ak.us Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders...
Boat Haulout Pier Structural Upgrades
04-18-2013
04-09-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Work consists of all activities necessary to construct the Wrangell Marine Service Center Boat Haulout Pier Structural Upgrades, which includes strengthening the concrete deck from below by installing steel beams and grouting between the beams and the concrete deck. Bid Date: 4/18/13, 2:00 pm local time Pre-Bid Meeting: 4/9/13, 11:00 am local time - City and Borough Council Chambers, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Amber Al-Haddad, (907) 874-3494 Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders...
King Career Center CTE Facility Upgrades – Phase 1
04-23-2013
04-02-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The contractor shall furnish all labor, materials, tools, and other equipment necessary to properly renovate the Welding, Construction, and Electrical/Plumbing Trades Shops at King Career Center. The project will consist of remodeling the existing shop areas and classrooms, and the addition of an exterior canopy located on the south side of the building. UPDATED Bid Date: 4/23/13, 10:00 am local time Pre-Bid Meeting: 4/3/13, 11:00 am local time - MAP Pre-Bid Site Visit: 4/2/13, 1:30 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Purchasing@asdk12.org Addenda: To Be...
Cooper Landing – Moose Pass Schools Roof Replacement
04-18-2013
04-10-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Removing / replacing built-up roofing at Cooper Landing and Moose Pass Schools. Built-up roofing to be (contractor’s choice) Option A – 5-ply Type III BUR or Option B – 4-ply SEBS per plans and specifications including framing, flashing, finishing insulation, mechanical drainage and electrical. Removal and replacement of the architectural shingle roofing at the Cooper Landing School. Bid Date: 4/18/13, 2:00 pm local time Updated Pre-Bid Meeting: 4/10/13, 10:00 am local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: purchasing@borough.kenai.ak.us Addenda: To Be Determined View/Download...
University Heights RSA – Road Improvements
04-09-2013
Alaska
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work consists of, but is not necessarily limited to, upgrading to a chip seal surface Cambridge Drive, portions of Ithaca Road and Holy Cross Drive, and a portion of Eton Boulevard. Bid Date: 4/9/13, 2:00 pm local time Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: purchasing@fnsb.us Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message. Add Me to Plan Holders...


