Oregon

Oxbow Park Septic Services

»Posted on May 16, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The contract contemplated consists of providing wastewater system inspection, monitoring, testing, maintenance and sampling at Oxbow Park. The selected contractor will: • On a quarterly basis, perform wastewater system inspection, monitoring, lab testing, maintenance and take samples. • Repair problems in septic system if necessary. • Prepare and submit a quarterly wastewater system monitoring report to Metro. • Prepare and submit to DEQ, and copy Metro, any required wastewater permit report (e.g. WPCF Permit) and any necessary documentation. The term of the contract is anticipated to be May 2013 through April 2014. Contract may be renewed or extended for four (4)...

read more

Clairmont Way Waterline Replacement and Pavement Rehabilitation

»Posted on May 16, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Furnish, install and remove temporary traffic control devices and temporary erosion control measures. Complete 10” water line installation. Replacement of existing water services and fire hydrants. Complete roadway asphalt pavement rehabilitation by means of full depth roadway reconstruction, cement treatment, cold plane asphalt pavement removal and inlay and asphalt pavement overlay. Restore striping and signing. Perform additional and incidental Work as called for by the Specifications and Plans. Bid Date: 6/11/13, 2:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Ken Valentine, 503-221-1131 Addenda: To Be...

read more

Exterior Insulation Finishing System Repairs, Phase II – Antoinette Hatfield Hall

»Posted on May 16, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Proposed work is to be performed in the alleyway between the facility and the First Congregational Church next door as well as in a mechanical well adjacent to the alley. Scope of work is the removal and replacement of the EIFS, all associated flashings and doors in the outlined work area. A more detailed scope of work and specifications are provided in Attachments A and B. Bid Date: 6/5/13, 2:00 pm PST Pre-Bid Meeting: 5/22/13, 9:00 am PST - Main Lobby, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Julie Hoffman, 503-797-1648, bidsandproposals@oregonmetro.gov Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan...

read more

Roof Repair on Halls C and D at Portland Expo Center

»Posted on May 16, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Metro is soliciting bids including all labor, materials, tools, equipment, and services necessary for roof repairs at several areas on Exhibit Halls C and D of the Portland Expo Center (EXPO) as defined by this request for bids (RFB). Work will consist of two (2) different Roof Systems detailed below (see specs) and a coating of the existing Hall C roof. Installation is to be as per Manufacturer’s specifications. Location of work areas for each method shown on attached Portland Expo Center Partial Site Plan Google-earth Map (Attachment A). The Portland Expo Center is located at 2060 N. Marine Drive, 97217. Contractor is responsible for field measuring EXPO designated...

read more

OAME Lane Community College Bld 11 Remodel

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: Demolition, Cast-in-Place Concrete, Shotcrete, Precast Architectural Concrete, Unit Masonry, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Cable Railings, Rough Carpentry, Exterior Finish Carpentry, Interior Architectural Woodwork, Bentonite Waterproofing, Traffic Coatings, Water Repellants, Thermal Insulation, Weather Barriers, Standing-Seam Metal Roof Panels, Fiber-Cement Siding and Soffits, EPDM Roofing, Sheet Metal Flashing and Trim, Joint Sealants, Hollow Metal Doors and Frames, Flush Wood Doors, Aluminum Storefronts and Windows, Door Hardware, Glazing, Gypsum Board, Acoustical...

read more

Expansion of the Pfriem Brewing Facility

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work includes build out of approximately 3,683 sq ft of warehouse space, expansion of 2 existing restrooms and new exterior work to include modifications to the existing parking lot, relocating 2 Van Accessible parking stalls, building a new outdoor seating area, new storefront glazing and entry door, new exterior canopy as noted on contract documents. Bid Date: 5/30/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/17/13, 2:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: (503) 227-8100, garyh@orangewallstudios.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List:...

read more

Alder Street: 18th Avenue to 24th Avenue (Eugene, OR)

»Posted on May 13, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: 400 HRS Flaggers; 1,400 CY General Excavation; 6,600 SF Cold Plane PVMT Removal, 2” Deep; 84 FT 10” C900 Storm Pipe; 4 EA Catch Basin W/Bicycle Grate; 6,200 SY In Place Cement Treated Base; 240 TON Portland Cement; 6,200 SY Lime Subgrade Treatment; 90 TON Lime; 2,300 TON Level 2, 1/2” Dense WMAC W/35% Binder Replacement; 130 TON Level 2, ½” Dense HMAC; 460 SY Plain Concrete PVMT, Dowelled, 9” Thick; 1,600 FT Concrete Curb & Gutter; 4,820 SF Concrete Walks; 360 SF Truncated Domes; 78 SF Retrofit Truncated Domes on Existing Ramps;1 LS Thermoplastic, Non-Profile, 90 Mil, Extruded; 10 EA PVMT Legend, Type B-HS: Bike Sharrow; 2 EA Bike Lane Loop Detector Installation....

read more

Air Supported Fabric Structure for Portland Tennis Center

»Posted on May 13, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The successful Bidder shall fabricate and install an air supported fabric structure at the Portland Tennis Center, located at 324 NE 12th Ave. The structure will cover the southern four existing outdoor tennis courts. Bid Date: 5/28/13, 2:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Denice Henshaw, 503-823-2299, denice.henshaw@portlandoregon.gov Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION...

read more

Yeon Shops West Front Structural

»Posted on May 9, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/20/13, 9:00 am PST - Columbia Conference Room, Annex Building MAP Description:  Remove existing west canopy including concrete roof and soil overburden. Install new steel canopy, deck and metal roof assembly. Repair damaged masonry walls. Price: Purchase prints, or free file download Refundable: No Project Contact: Paula Rickman, 503-988-5111 Ext. 24380, paula.j.rickman@multco.us Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact...

read more

Faubion K-8 Portable Classroom Bldgs Site Work

»Posted on May 9, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Mandatory Pre-Bid Site Visit: 5/15/13, 10:00 am PST – MAP Description: Work of this Contract as more completely detailed in the Contract Documents, is comprised of: Siting the location of the new Portable buildings to be placed by others. Relocation of existing utilities as needed to accommodate new portable buildings and construction of all site utilities inclusive of connection to the POC’s identified on the Portable buildings. Construction of storm water system inclusive of connection to portable building downspouts, construction and connection to new underground infiltration system and any connections required to tie to or relocate the...

read more

Access Control and Video Equipement 2013-1649

»Posted on May 6, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/15/13, 2:00 pm PST Pre-Bid Meeting: 5/7/13, 9:00 am PST – MAP Description: Portland Public Schools (“District”) seeks written proposals from qualified vendors able to provide card access control and video camera equipment installation and support at 15 District sites. The District intends to award a single contract as a result of this RFP; however the District reserves the right to award multiple contracts if determined to be in the best interest of the District. Price: Purchase prints, or free file download Refundable: No Project Contact: Lee Fleming, (503) 916-3113, purchasing@pps.net Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View...

read more

Alder Creek Fish Passage Project

»Posted on May 6, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project has two parts. The first part is constructing a fish ladder to modify an existing waterfall under the Hwy 26 bridge over Alder Creek (Waterfall site). The second part is modifying the City of Sandy's water diversion structure on Alder Creek (Diversion Dam site). The work to be performed includes furnishing of all services, materials, equipment, and labor to complete both projects. Bid Date: 5/28/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/15/13, 1:30 pm - MAP Estimated Cost: $450,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Kelly Davis-McKernan, 503-823-7574, kelly.davis-mckernan@portlandoregon.gov Addenda: To Be...

read more

2013 Major Rehabilitation – Coos Bay, Siuslaw, and Umpqua Swing Span Bridge Repairs

»Posted on May 6, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work for this Project includes the repair and/or rehabilitation to Bridge 763.55: Coos Bay Swing Span Bridge (Section 2); Bridge 716.40: Siuslaw Swing Span Bridge (Section 3) and Bridge 739.63: Umpqua Swing Span Bridge (Section 2) on the Coos Bay Rail Link (CBRL) located in Coos, Lane and Douglas Counties, as quantified in the work specification sections of the Bid Documents, and Bid Form. Bid Date: 5/28/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/14/13, 7:30 am PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Donna Nichols, Dnichols@PortofCoosBay.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan...

read more

Multisite Boiler Replacements 2013

»Posted on May 6, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Briefly, the work is described as Project consists of Replacement of boilers and associated piping at Churchill High School, Willagillespie Elementary, Camas Ridge Elementary, and (as additive alternate) Spring Creek Elementary. Base bid also includes replacement of DHW heating system at Churchill High School. Bid Date: 5/16/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/7/13, 2:00 pm PST - Boiler Room, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: n/a Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out...

read more

PCC BP4B – Student Center (Portland Community College)

»Posted on May 3, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Pre-Bid Meeting: 5/7/13, 9:00 am PST – Large Conference Room, MAP Description: Numerous bid items, including: Metals, Drywall, Architectural Woodwork, Openings, Overhead Coiling Doors, Folding Fire Doors, Interior All-Glass Entrances, Storefronts and Glazing, Tiling, Flooring, Painting, Specialties, Toilet Compartments, Operable Folding Panel Partitions, Food Equipment – see RFP/Specs for complete description. Price: Purchase prints, or free file download Refundable: No Project Contact: Mark Matthews, mark@pacificmarkconstruction.com Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download...

read more

Sunset Swim Center Pervious Parking Lot Renovation

»Posted on May 2, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/21/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/9/13, 2:00 pm PST – MAP Description: Project includes but not limited to: Site preparation and installation of a pervious concrete parking lot; asphalt/concrete removal; site landscaping; erosion control and tree protection measures, and finish grading and seeding. Estimated Project Value: $340,000 Price: Purchase prints, or free file download Refundable: No Project Contact: Jerry Burgess, 503-629-6305, jburgess@thprd.org Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFsDownload Addendum No. 1Download Addendum No. 2 View Plan Holders List Add This Project to...

read more

Hansen Ridge Park Improvements

»Posted on May 2, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/16/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/8/13, 10:00 am PST – MAP Description: Project includes but not limited to: site preparation and demolition, clearing and grubbing, earthwork, asphalt and concrete pathways, concrete curbs and sidewalks, pedestrian bridge, play equipment, site furnishings, parking area and street improvements, fencing, water meter and irrigation, storm drainage improvements, basalt wall and boulders, landscape plantings, and other associated site work. Estimated Project Value: $510,515 Price: Purchase prints, or free file download Refundable: No Project Contact: Brad Hauschild, 503-629-6305, bhauschild@thprd.org Addenda: To Be...

read more

SE 2nd Ave, SE 3rd Ave, and SE Adler St Consolidation Project

»Posted on May 2, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description:1. Construct, maintain, and remove temporary work zone traffic control measures. 2. Construct, maintain, and remove erosion control measures. 3. Construct, maintain, and remove temporary flow diversion. 4. Perform all removal of structures and obstruction, and earthwork operations. 5. Remove and dispose of all contaminated media. 6. Install diversion vault and corrosion control. 7. Replace existing sewer pipe with new pipe. 8. Construct manholes. 9. Construct service connections. 10. Construct inlets and inlet pipes. 11. Trench pavement restoration. 12. Construct roadway improvements including aggregate base, MWMAC wearing surfaces, concrete curb, sidewalks and all...

read more

Roof Projects – Oregon Zoo

»Posted on May 2, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description:FELINE BUILDING ROOF REPLACEMENT • Demolition of existing installations to facilitate the work of this contract. • Perform all Infrared and Capacitance scans and reporting. • Install new roofing systems and products. HOOFSTOCK BUILDING ROOF REPLACEMENT • Demolition of existing installations to facilitate the work of this contract. • Perform all Infrared and Capacitance scans and reporting. • Install new roofing systems and products. AFRICAFE BUILDING ROOF RESTORATION & REPAIR • Demolition of existing installations to facilitate the work of this contract. • Perform all Infrared and Capacitance scans and reporting. • Install restoration, repairs, new roofing systems...

read more

Depoe Bay Trail – Whales Cove & Boiler Bay Sections

»Posted on May 1, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/16/13, 2:00 pm PST Pre-Bid Meeting: 5/7/13, 10:00 am PST - MAP Description: This Project includes construction of approximately 2.6 miles of new trail along highway 101.  Two separate trail sections will be constructed; one from Rocky Creek State Park to just south of Depoe Bay and the other section begins at Boiler Bay State Wayside and ends just past Fogarty Creek State Recreation Area.  The Work is summarized as follows: clear and grub approximately 2.6 miles of trail, construct wood puncheons, a wood bridge, and rock stairways as required. Estimated Cost: $100,000 - $105,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Dolly...

read more

Central Library Interior and Exterior Painting

»Posted on Apr 29, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/6/13, 9:00 am PST – MAP Description: Paint the exterior trim and paint the interior public areas where needed. Install exterior scaffolding and or swing staging and make wood repairs as needed on exterior trim. Price: Purchase prints, or free file download Refundable: No Project Contact: Paula Rickman, 503-988-5111 Ext. 24380, paula.j.rickman@multco.us Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFsDownload Addendum No. 1 View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name *...

read more

Rock Creek Hatchery Chain Link Fencing Project

»Posted on Apr 26, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Oregon Department of Fish and Wildlife (ODFW) Rock Creek Fish Hatchery, 425 McCarn Lane, Idleyld Park, Oregon, 97447 is requesting quotes for labor, equipment, materials, incidentals and permits required to install approximately 1000' lineal feet of new vinyl coated chain link fencing and 17 gates around fish rearing ponds. Bid Date: 5/10/13, 1:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Patty Whalen, (503) 947-6138, Patty.L.Whalen@state.or.us Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could...

read more

Multiple Building Security Upgrades

»Posted on Apr 26, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Project includes installation of security systems at multiple buildings as designated in the bid documents. It includes three separate security systems (access control, duress buttons / alarms, and security cameras) at the Josephine County Courthouse, Josephine County Juvenile Justice Center, and the Josephine County Adult Jail (Grants Pass, OR). Additionally, the project includes cameras ONLY at Clatsop County Courthouse (Astoria, OR), Columbia County Courthouse (St Helens, OR), Robertson Building Tax Court (Salem, OR), Justice Building and Supreme Court Building (both in Salem, OR). Package includes all wiring equipment and components for complete functional systems...

read more

OAME 2013 Pavement Preservation (City of Troutdale)

»Posted on Apr 26, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/8/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: The work to be done consists of asphalt pavement surface preparation and application of a Type II Slurry Seal on City of Troutdale streets amounting to approximately 300,197 square yards of treated asphalt concrete pavement area. Price: Purchase prints, or free file download Refundable: No Project Contact: John J. Bushard, (503) 674-7240, john.bushard@troutdaleoregon.gov Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name...

read more

Building 15 Renovation – Lane Community College

»Posted on Apr 24, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Project consists of the renovation of the existing Building 15 on Lane Community College, Main Campus located at 4000 East 30th Avenue, Eugene, Oregon. Bid Date: 5/16/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/1/13, 2:00 pm PST - Building 7, Room 212 MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Lana Sadler, (541) 342-8077 Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Building 15 Renovation – Lane Community College   Seattle Daily Journal of Commerce – (Plan Center) Contact: Ken Elliott Address: 83 Columbia St  Seattle, WA  98104 Contact by:...

read more

1824 Lansing Fire Restoration (City of Salem)

»Posted on Apr 23, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Fire restoration work in one side of a duplex, including replacement of  kitchen, ceiling, kitchen cabinets, appliances, insulation, flooring, windows, and smoke damage cleaning and sealing throughout the unit. Bid Date: 5/14/13, 2:30 pm PST Pre-Bid Site Visit: 4/25/13, 10:00 am PST - MAP Estimated Cost: $32,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Terry Frazier, 503-588-6454, tfrazier@cityofsalem.net Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List: 1824 Lansing Fire Restoration (City of Salem)   Seattle Daily Journal of Commerce – (Plan Center) Contact:...

read more

Community Center Boiler Replacement & Hot Water System Improvements

»Posted on Apr 23, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/7/13, 2:00 pm PST Pre-Bid Site Visit: 4/29/13, 2:00 pm PST – MAP Description: Replacement of existing hydronic boiler. Replacement of existing domestic water heating system. Replacement of existing pool heating heat exchangers. Modification of existing domestic hot water system. Performance of all necessary demolition and opening of existing building surfaces as necessary to perform the work. Patching and repair all affected areas to match adjacent construction and finishes. Price: Purchase prints, or free file download Refundable: No Project Contact: lukeg@lincolncity.org Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order...

read more

Pioneer Park

»Posted on Apr 18, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/8/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 4/23/13, 2:30 pm PST – Dryland Training Room, MAP Description: This construction will be carried out under one General Construction Agreement covering the construction work on this project. These Instructions To Bidders amend or supplement any other provisions of the Bidding and Contract Documents. This agreement includes all labor, materials, transportation, equipment and services necessary for and reasonably incidental to the completion of all work in connection with the project described in this Project Manual and all accompanying Drawings. Estimated Project Value: $175,000 Price: Purchase prints, or free file...

read more

SW Huber St: SW 35th Ave to SW 43rd Ave (City of Portland)

»Posted on Apr 18, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construct, maintain, and remove temporary work zone traffic control measures. Construct, maintain, and remove erosion control  measures. Perform all removal of structures and obstruction, clearing and grubbing, and earthwork operations. Construct drainage system including sewer pipes and inlets. Construct retaining walls. Construct roadway improvements including aggregate base, MWMAC wearing surfaces, concrete curb, and sidewalks. Place pavement markings and striping. Install signing. Roadside development including seeding, planting, fencing, and mailboxes. Bid Date: 5/7/13, 2:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $450,000 Price: Purchase Prints or Free File...

read more

NE Prescott St from NE 105th Ave to NE 116th Ave Sidewalk Infill

»Posted on Apr 17, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Improvements shall consist of those items of work listed in the Proposal and as shown on the accompanying Plans. The Contractor shall perform all labor, and furnish all materials, equipment and incidentals required to make each item complete. Work shall include, but not be limited to:1. Construct, maintain, and remove temporary work zone traffic control measures. 2. Construct, maintain, and remove erosion control measures. 3. Perform all removal of structures and obstruction, clearing and grubbing, and earthwork operations. 4. Construct drainage system including water quality facilities, sewer pipes, manholes and inlets. 5. Construct roadway improvements including...

read more