Search by Project Name
Projects by State
Category Archives: Washington
Northstar Middle School (Lake Washington School District)
Description: 1. This project entails site and building construction to support the installation of 4 portable buildings. 2. The portable buildings and their foundations are provided under a separate contract and are not a part of this work. 3. Excavation and backfill … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
UW S1 & Portage Bay Garage Maintenance
Description: The project includes the following work at two existing concrete parking structures: Repair delaminating/spalling concrete; replace expansion joints; repair exposed rebar and structural steel; machine wash weather-exposed decks; replace sealant joints; replace grout at post tensioned cable pockets; epoxy inject cracks; apply coatings … Continue reading
Masonry Restoration on Barge Hall, Central Washington University
Description: The Work includes repair and/or select replacement of existing brick and stone masonry at Barge Hall, a listed building on the National Register of Historic Buildings, including, but not necessarily limited to the following: 1. Removal of brick and stone masonry which … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 04-Masonry, 07-Thermal & Moisture, 33-Utillities Leave a comment
I5 Military Rd to NE 117th St Pavement Repair (WSDOT)
Description: The improvement of I-5 in King County, MP 144.69 to MP 147.64 and MP 167.70 to 173.15, Military Rd to NE 117th St, Pavement Repair, by sawcutting and replacing damaged Portland cement concrete panels, excavating deficient subgrade, cement concrete pavement grinding, upgrading … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 08-Openings, 09-Finishes Leave a comment
SR14 Maryhill Rd Vc to Wood Cr Br BST (WSDOT)
Description: The improvement of SR 14 by Bituminous Surface Treatment, pavement repair, lane markings, centerline rumble strips, and permanent signing. Bid Date: 6/6/12, 11:00 am PST Walk Thru: n/a Project Contact: Chris Tams, (866) 279-0730 Price: Purchase prints, or free file download Refundable: No Addenda: To Be Determined … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 08-Openings Leave a comment
Snoqualmie Middle School Courtyard Infill
Description: Building Addition, all work associated with the building addition as indicated on the drawings and as noted below: - All demolition work within the existing courtyard and associated with the connection and access to the addition of the Courtyard Infill, including removal of … Continue reading
UW Fish Teach & Research Building Chiller Replacement Project
Description: The project includes the following work: Removal and replacement of an existing 80 ton, water cooled environmental chiller. Removal and replacement of existing chilled water pumps and condenser water pumps and motors. Removal and replacement of two 15 ton process chillers and … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 03-Concrete, 07-Thermal & Moisture, 23-HVAC, 26-Electrical Leave a comment
SR3 SR16 Gorst to Sherman Hill and Jackson Ave to Jct SR 3 Paving (WSDOT)
Description: 3.35 miles of SR16, between MP 4.98 and MP 7.32, at MP 14.96, in Pierce County, at MP 23.94 and between MP 25.98 and MP 29.19 in Kitsap County, and 7.62 miles of SR 3, between MP 34.31 and MP 36.25, MP … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 04-Masonry, 05-Metals, 07-Thermal & Moisture, 08-Openings, 09-Finishes Leave a comment
I-5 & I-205 NE 134th St Interchange Stage 2 (WSDOT)
Description: For the improvement of I-5/I-205, 0.98 miles of lnterstate 5, MP 6.95 to MP 7.93, and 0.50 miles of lnterstate 205, MP 36.07 to MP 37.16 in Clark County, by constructing bridges at NE 139th Street, associated bridge ramps, and removing … Continue reading
I-182 & I-90 Rd 100 Vic & N Bend to Ellensburg – Improve ITS (WDSOT)
Description: Improvement of 1-90 in King and Kittitas Counties, MP 31.35 to MP 101.45, and 1-1 82 in Benton and Franklin Counties, MP 5.07 to 7.31, Improve Intelligent Transportation System, by installing intelligent transportation systems, preserving existing ITS components, installing fiber communications, and providing traffic … Continue reading
SR 96 Dumas Road Channelization (WSDOT)
Description: Improvement of SR 96 in Snohomish County and the City of Mill Creek, MP 0.53 to MP 0.75, Dumas Road Channelization by re-channelizing the SR96/Dumas Road intersection (EB leg) by restriping the existing transit-only lane to allow usage of the eastbound right turn … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 07-Thermal & Moisture, 08-Openings, 09-Finishes Leave a comment
SR285 W End of George Sellar Bridge Intersection Improvements (WSDOT)
Description: The improvement of SR 285, MP 0.28 to MP 1.14 in Chelan County, W. End of George Sellar Bridge Intersection Improvements, by roadway excavation including haul, embankment compaction, drainage, inlets, catch basins, quarry spalls, storm sewer pipe, Superstructure widening and … Continue reading
UW Power Plant Exhaust Stack Repaint
Description: All work will be contained within the University of Washington Power Plant. Work includes the following: Fabrication and installation of a exhaust breeching duct isolation device. Inspection of the main boiler exhaust stack interior. Addition of obstruction lighting on the main boiler exhaust … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 09-Finishes, 23-HVAC, 26-Electrical Leave a comment
CWU Roofing Replacement on Sparks Hall
Description: 1. Remove existing 3-tab asphaltic shingle roofing system, including underlayment, metal flashing, and areas of copper roofing, organic growth, and debris. Existing materials are nailed/stapled to an existing sloped plywood deck. 2. Remove existing skylights, extend curbs 3. Clean substrate deck, and … Continue reading
J Wing Vestibule Enclosure (Dept of Veteran Affairs)
Description: Tenant Improvement: Enclosure of existing J Wing vestibule with a pair of swing doors with automatic opener at the north opening and a bi-parting automatic sliding entrance at the west opening. Relocation of existing Vending Room and Library swing door entrances and the … Continue reading
Nelsen Middle School Site Improvements (Renton School District)
Description: The replacement of the existing track and baseball field which includes site grading, drainage and irrigation, landscaping and site retaining walls. The work also includes the replacement of the interior doors, replacement and extension of the fire alarm system, replacement of the cafeteria … Continue reading
SR502 I-5 to Battle Ground Add Lanes Phase 1 (WSDOT)
Description: Improvement of SR 502 by constructing stormwater ponds, wetland mitigation sites, a column supported embankment, and hazardous material removal. Bid Date: 5/16/12, 11:00 am PST Walk Thru: n/a Price: Purchase prints, or free file download Refundable: no Check to: Chris Tams, (360) 759-1310 Addenda: To Be Determined … Continue reading
SR529 SB Snohomish River Bridge Special Bridge Repair (WSDOT)
Description: Improvement of SR 529 in Snohomish County, MP 4.03 to MP 4.21, SB Snohomish River Bridge Special Bridge Repair, for Bridge 529/10W by replacement and rehabilitation work for machinery components and counterweight ropes, as well as electrical work, for the moveable lift span … Continue reading
SR 100 Including Spur Paving (WSDOT)
Description: For the improvement of 4.68 miles of SR 100, MP 0.00 to MP 4.68, and 0.61 miles of SR 100 Spur, MP 2.95 to MP 3.56, in Pacific County by planing, placing HMA, placing BST, upgrading signs, upgrading sidewalk ramps to ADA standards, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 08-Openings Leave a comment
SR503 Ham Road VIC to Rudy Ross Rd (WSDOT)
Description: The improvement of 12.94 miles of SR 503, MP 29.96 to 51.17 with exceptions in Cowlitz County by pavement repair, paving with HMA, placement of BST, guardrail upgrades, restoration of pavement markings, and permanent signing. Bid Date: 5/23/12, 11:00 am PST Walk Thru: … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 04-Masonry, 05-Metals, 08-Openings Leave a comment
SR US 2-97 West of Wenatchee Paving & I/S Improvements (WSDOT)
Description: Improvement of US 2 MP 11 7.62 to MP 11 9.1 6 and US 97A MP 199.83 to MP 201.57 all in Chelan County, West of Wenatchee Paving and Intersection Improvements, by preparation, grading, drainage, storm sewer, structure, surfacing, hot mix asphalt, traffic, … Continue reading
US12 Et Al 2010-2011 SCR Region Wide Safety (WSDOT)
Description: The improvement of US12 in Yakima, Benton, and Walla Walla counties, by performing region wide safety work, by placing crushed surfacing base course, paving with HMA, installing and repairing guardrail, concrete barrier, flexible guide posts, drainage, traffic control, pavement markings, and permanent … Continue reading
US12 Et Al 2012 SCR Region Wide Deck Rehabilitation (WSDOT)
Description: The improvement of US 12 MP 199.11 to MP 199.31, SR 22 MP 36.44 to MP 36.52, 1-82 MP 28.92 to MP 29.1 5, 1-82 MP 81.64 to MP 81.95, and SR 261 MP 10.22 to MP 10.32, in Yakima, Benton and Columbia … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Yelm Community Schools Support Operations Center Phase 2
Description: The Work consists of complete construction of the following: I. Approximately 4,431 square feet of interior tenant improvement of an existing construction Type V-B metal building. The remaining 5,591 square feet of “un-defined” shall have minor improvements. 2. Demolition of existing building … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 13-Special Construction, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
PW12_0166F 2011 Sidewalk Reconstruction (City of Tacoma)
Description: This contract shall generally consist of removal of pavement, curb and sidewalk and the construction of asphalt and concrete pavement, curb, sidewalk and curb ramps in compliance with the Americans with Disabilities Act at various locations within the City limits of Tacoma. Estimated … Continue reading
UW Suzzallo Library Fire Protection
Description: The project includes the following work: Extend the existing fire protection system by approximately 145,000 square feet to provide coverage on seven floors of the 1963 addition of Suzzallo Library. A combination standpipe exists to serve this area. New fire protection system … Continue reading
Renaissance Middle School Campus, Lake Washington School District
Description: The Work consists of site improvements to accommodate a new middle school campus consisting of portable structures, but not limited to: a. Selective site demolition of asphalt, concrete curbs and sidewalks. b. Adjustments to existing stormwater system. c. Grading as required … Continue reading
Posted in Public, Washington Leave a comment
Greenwood Park Sport Court
Description: Greenwood Park, Fremont Ave. N & N. 87th St. Seattle, WA. BASEBID: Site preparation, asphalt court, goal installation (owner furnished), concrete walls and paving, site restoration. BID ADDITIVE #IA:s phalt path and grading. BID ADDITIVE #2: Picnic table and concrete pad. The Engineers estimate … Continue reading
UW Meany Hall Fire Protection
Description: Meany Hall is partially protected with fire sprinklers. Provide fire sprinkler protection in the remainder of the building. Connect to existing wet pipe sprinkler systems. Route piping to minimize architectural and structural impacts. Provide core drilling, and minor wall and ceiling repairs … Continue reading
UW HSC E Court Membrane Replacement
Description: The project replaces the waterproof membrane in a landscaped courtyard above an occupied building. Work includes: demolish all existing paving, landscaping, site furnishings, selected concrete accessories, rails, insulation and waterproofing; remove regulated materials; provide new waterproofing membrane, protection, insulation, paving, landscape overburden, irrigation, … Continue reading
UW Tower High Sensitivity Smoke Detector Project
Description: a. Provide all material, labor, equipment, design and services necessary to perform the installation of a High Sensitivity Smoke Detector (HSSD) system(s) for the 9,630 sq.ft. of raised floor area, at the UW Tower Date Center. b. The HSSD shall be aspirating, … Continue reading
Kane Hall Fire Protection – UW
Description: Kane Hall is partially protected with fire sprinklers. Provide fire sprinkler protection in the remainder of the building. Connect to existing wet pipe sprinkler systems. Route piping to minimize architectural and structural impacts. Provide core drilling, and minor wall and ceiling repairs … Continue reading
UW Hitchcock Hall 546 Torii HHMI Lab
Description: Project scope includes renovation and combination of Room 546 & 547 to form a 948 SF biology research lab located in Hitchcock Hall at 1555 NE Pacific St., Seattle, Washington. Project includes: 1. Demolition of existing casework, ceilings and floor finishes. 2. Provision … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 10-Specialties, 11-Equipment, 12-Furnishings, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
SCC Bldg 1500 Roof & HVAC Replacement
Description: See specs for complete details Bid Date: 5/10/12, 3:00 pm PST Walk Thru: n/a Price: $50 deposit or free file download Refundable: Yes Check to: Schreiber Starling & Lane Architects Project Contact: Ross Whitehead, Schreiber Starling & Lane Architects, (206) 682-8300 Addenda: To Be Determined Host: ARC-Seattle … Continue reading
Lake Washington Institute of Technology Roof Top Replacement – Gas Distribution – Lab Safety
Description: See specs for complete description Bid Date: 5/8/12, 3:00 pm PST Walk Thru: 4/26/12 1:00 pm PST, Room W305B, Lake Washington Institute of Technology MAP Price: $50 Refundable: Yes Check to: Schreiber Starling & Lane Architects Project Contact: Ross Whitehead, Schreiber Starling & Lane Architects, (206) 682-8300 Addenda: To Be … Continue reading
Merrill Hall Strip, Repair, Refinish, University of Washington
Description: Strip finish from existing siding; replace wood battens; repair and refinish the siding; replace engineered lumber columns with galvanized steel columns; provide miscellaneous metal flashings and trim;; salvage and reinstall existing metal sunshades, mechanical pipe covers, miscellaneous flashings, and metal “gaskets” at glass … Continue reading
UW Lander Hall Replacement BP 02.01 – HazMat & Demolition
Description: The Project will demolish Lander Hall and construct a 200,000 SF seven-story building comprised of a five story wood framed building with residential occupancy over two stories of concrete construction with mixed-use occupancy. The Project is targeting the US Green Building Council’s Leadership in … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete Leave a comment
L-NE Road Overlay CRP 12-02, Grant County
Description: This contract provides for the construction of 2.29 miles of HMA overlay on a two lane county road in Grant County, WA, and includes planing bituminous pavement, shoulder finishing, hot mix asphalt, project temporary traffic control, painted centerline and edge line and … Continue reading
Posted in Public, Washington Tagged 01-General, 04-Masonry, 05-Metals, 08-Openings, 09-Finishes Leave a comment
Vashon Island High School Modernization – MACC #1, Vashon Island School District
Description: The project entails a standalone replacement of the main Vashon Island High School academic building. While this project is being done the school will be occupied during construction. Scope includes a new stand alone 78,482 sf comprehensive replacement high school that houses classrooms, … Continue reading
Albertsons Store #461- Remodel, Everett
Description: The work as shown on the Bid Documents including, but not limited to, the General Construction; Plumbing; Automatic Fire Sprinkler; Heating, Ventilating, and Air Conditioning; and Electrical Work for Store #0461 , all in accordance with the Standard Conditions, the Drawings, and … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 13-Special Construction, 15 Mechanical, 16-Electrical Leave a comment
Access Control Door Additions Project – SeaTac Airport (Port of Seattle)
Description: The project will install biometric access controls, security cameras and intercoms at 33 doors throughout the airport terminal and other communications equipment installation in the SAC rooms. In addition to the electrical and communications work, there will be door hardware installation, patching and … Continue reading
Juanita High School Commons Remodel (Lake Washington School District)
Description: The tenant improvement work at Juanita High School is intended to expand the seating capacity of the commons space and create a more efficient food serving area. To accomplish this, a separate serving space is created through selective demolition and reconfiguring of existing … Continue reading
Riverview Educational Service Center Building (Riverview School District)
Description: The existing facility purchased by the Riverview School District is to be remodeled into their administrative offices. The building consists of two wings, connected by a lobby (see diagram). One wing is the multipurpose room with a kitchen and storage area. This wing … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 23-HVAC, 26-Electrical, 27-Communications Leave a comment
US 395 NSC – Francis Avenue Improvements (WSDOT)
Description: For the improvement of US 395 in the City of Spokane and in Spokane County at MP 161.45, 0.4 miles of Francis Avenue, and 0.2 miles of Market Street, by performing clearing and grubbing, earthwork, drainage, surfacing, HMA paving, PCCP paving, approach slabs, removing … Continue reading
WQ12-0142F South Tacoma Groundwater Treatment Facilities (City of Tacoma)
Description: Construct corrosion control and fluoridation facilities, and associate pipelines, buildings, and systems, at Hood Street Reservoir, and a diffused aeration system, and associated systems, at the South Tacoma Pump Station. Bid Date: 5/15/12, 11:00 am PST Pre-Bid Mtg: 5/1/12, 9:00 am PST Conference … Continue reading
SR112 Unnamed Tributary to Pysht River Fish Barrier Removal (WSDOT)
Description: The improvement of 0.04 miles of SR 112 in Clallam county, MP 25.57 to MP 25.61, by replacing a culvert with a 3 sided structure. This work consists of clearing and grubbing, grading, furnishing and installing a stream diversion, and a precast reinforced concrete … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
SR112 Nelson Creek Remove Fish Barrier (WSDOT)
Description: For the improvement of 0.13 miles of SR 112 in Clallam County, MP 47.00 to MP 47.13 Nelson Creek – Remove Fish Barrier, by removing a fish barrier culvert. This work consists of clearing and grubbing, excavating and compacting soils, placing streambed aggregates, furnishing … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
US97 North of Goldendale Wildlife Habitat Connectivity/Fish Passage (WSDOT)
Description: The improvement of fish and wildlife connectivity on US 97 from MP 21.05 to MP 21.72 by removing a fish barrier (culvert, concrete walls and aprons), constructing a temporary detour, reconstructing the Butler Creek channel, constructing a new bridge, installing wildlife fence and jumpout … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
US395 Pioneer Memorial Bridge Joint Repair (WSDOT)
Description: The improvement of US 395, MP 18.59 to MP 19.07 in Franklin and Benton counties, Pioneer Memorial Bridge 395/40 by removing existing modular expansion joint systems, and designing, fabricating, furnishing and installing replacement modular expansion joint systems. Bid Date: 5/9/12, 11:00 am PST Walk … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings Leave a comment
Sunset Chev Stadium Renovation (Sumner School Dist.)
Description: a. heating, ventilation, and air conditioning, b. plumbing as described in RCW 18.106, c. electrical work as described in RCW 19.28, d. fire protection work as described in Section 210000 of the Project Manual; and e. any other categories … Continue reading
SR112 & 113 State Highways in NW Clallam County Chip Seal (WSDOT)
Description: The improvement of 18.36 miles of SR 112, MP 0.00 to 20.55, and 9.88 miles of SR 113, MP 0.00 to 9.88, in Clallam County, by pavement repair, preleveling, bituminous surface treatment, pavement markings, guardrail, retrofitting one bridge with thrie beam guardrail, permanent signing, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 04-Masonry, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Lindbergh High School Improvements (Renton School District)
Description: This Project is for Improvements to Lindbergh High School. Improvements include but are not limited to: Construction of fire lanes, parking, storm drainage work, concrete pavement, landscaping and irrigation, site lighting, covered walk structures, kitchen upgrades, and exterior door … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
I-90 BN RR Bridge to Vic Geiger Rd – Paving (WSDOT)
Description: Improvement of I-90 in Spokane County, from MP 270.13 to MP 275.55. This project will consist of removing a redirectional land form, planing bituminous pavement, inlaying HMA pavement, crack sealing and fog sealing shoulders, rumble strips, installing guardrail, pavement markings, guideposts, permanent signing, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 08-Openings, 09-Finishes Leave a comment
Gildo Rey Elementary School Improvements (Auburn School Dist. #408)
Description: Work includes, but is not limited to, demolition of a modular building, removal of underground fuel and septic tanks, replacement and expansion of parking lots, masonry repair and coating, refinishing of a wood gym floor, window coverings, kitchen improvements, a … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 22-Plumbing, 23-HVAC, 24-Telcom / Security, 26-Electrical, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
Graham Kapowsin High School Science Classroom Improvements (Bethel School District #403)
Description: The work includes upgrades to four existing science classrooms, conversion of two standard classrooms to science classrooms, transportation and electrical connection of a double portable classroom from an elementary school to the high school, conversion of an existing double … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
SR99 AWV S Holgate St to S King St – Stage 3 (WSDOT)
Description: The improvement of SR 99, MP 30.16 to MP 30.46, in King County, AWV S Holgate St to S King St – Stage 3 – Atlantic St Bypass, by grading, constructing storm drainage systems, fire protection systems, bridges H-I and H-2, retaining walls, … Continue reading
Early Childhood Learning Center (Renton School District No. 403)
Description: Construction of new Early Childhood Learning Center and related sitework. Work includes Demolition of Existing Building, Hazmat, Civil, Landscape, Architectural, Structural, Mechanical, Plumbing, Electrical, and Food Services improvements. Work shall be performed in phases. Bid Date (note new bid … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
US101 Bone River Bridge Replace Bridge (WSDOT)
Description: The improvement of US 101, by removing an existing timber bridge, constructing and removing a temporary bridge, and constructing a prestressed concrete girder bridge. Bid Date (note new bid date): 5/16/12, 11:00 am PST Walk Thru: n/a Price: Purchase prints or free file download Refundable: No … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
US 195 Babbit Rd to Colfax – Paving (WSDOT)
Description: Paving 8.41 miles of US 195 from MP 28.82 to MP 37.55, in Whitman County, by performing roadway excavation, installing geotextile, rock cap, crushed surfacing base course, planing bituminous pavement, HMA pavement, crack sealing, concrete sidewalk ramps, drainage, rumble strips, raising guardrail, pavement markings, guideposts, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
I-5 NE 179th St to Koontz Rd Vic. w/exceptions – Rumble Strips Infill (WSDOT)
Description: I-5 southbound direction between MP 9.53 to MP 12.65 in Clark County and between MP 64.78 to MP 69.44 (both directions) in Lewis County, by installing rumble strips, pavement markings, grading, and pavement repair. Bid Date: 05/09/12, 11:00 am PST Walk Thru: n/a Price: Purchase … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 09-Finishes Leave a comment
SR 520 Evans Creek Eastside Wetland Mitigation (WSDOT)
Description: SR 520 Evans Creek Wetland Mitigation Site in King County and the City of Redmond, MP 12.83, vicinity of 188th Ave. NE and NE 84th Street and provides wetland restoration. Construction work to be performed is within existing sensitive areas adjacent to Bear … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings Leave a comment
Bickford Ave I/C Safety and Culvert Replacement (WSDOT)
Description: US 2 in Snohomish County, MP 2.65 to MP 4.51, Bickford Ave I/C, Safety and Culvert Replacement; by constructing a bridge over US 2, removal of the existing Bickford Avenue junction, modifications to 1 ramp, installation of 2 ramps, wall construction, drainage, storm … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings Leave a comment
US 2 Stevens Pass Variable Message Signs (WSDOT)
Description: US 2 MP 57.50 to MP 105.32, in King and Chelan Counties, Stevens Pass Variable Message Signs, by roadway excavation including haul, quarry spalls, guardrail, precast concrete barrier, cantilever sign structures, pedestrian VMS supports, and ITS Systems. Bid Date: 4/19/12, 2:00 pm PST … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings Leave a comment
North Blewett Pass Safety Improvements (WSDOT)
Description: Improvement of US 97 MP 175.50 to MP 177.00 in Chelan County, North Blewett Pass Safety Improvements, by guardrail, precast concrete barrier Type 2, guideposts, plastic pavement markings, permanent signing. Bid Date: 4/26/2012, 11:00 am PST Walk Thru: n/a Price: Purchase prints … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
SR 706 Chip Seal – E of 182nd Ave Ct E to W of 314th Ave Ct E, Pierce County (WSDOT)
Description: Improvement of SR 706, in Pierce County, MP 0.72 to 2.56 and MP 4.00 to 8.00, E of 182nd Ave Ct E to W of 314th Ct E – Chip Seal, by rehabilitating the existing pavement with pavement repair and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 08-Openings, 09-Finishes Leave a comment
Roof Replacements Wandermere Area & Pines Facilities (WSDOT)
Description: The work for this project includes single-ply roof and metal roofing replacements, overflow drain, roof access ladder, and incidental work required in accordance with the Contract Documents. Bid Date: 04/25/12, 11:00 am PST Walk Thru: 04/17/12 9:00 am – Wandermere Area … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 23-HVAC, 26-Electrical Leave a comment
Skyview Junior High School Tenant Improvements (Northshore School District #417)
Description: 1. Modifications to teacher planning rooms. 2. Installation of movable partition and modifications to choir room and adjacent commons space. 3. Modifications to the science prep room to create additional teacher planning space. 4. Miscellaneous finish and casework modifications … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 21-Fire Suppression, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
Bethel & Spanaway Lake HS Science Classroom Improvements (Bethel School District #403)
Description: The Work consists of: Renovations to existing Science classrooms at Bethel High School and Spanaway Lake High School with modifications to existing electrical, mechanical and fire sprinkler systems. Construction Type for Bethel High School is Type V-A fully sprinkled … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
Covered Play Structures for Cascade & Maplewood Heights Elementary Schools (Renton School Dist #403)
Description: This Project is for construction of Covered Play Structures at Cascade and Maplewood Heights Elementary Schools. Improvements include construction of play area structures, installation of athletic equipment, pavement, stonn drainage work, and miscellaneous improvements. Estimated Project Cost: $700,000 – … Continue reading
PW12-0083F – Stadium Way Arterial Project (City of Tacoma)
Description: This Contract provides for the improvement of pavement, street lighting, sanitary sewer, storm sewer, and other utilities, handrails and sidewalks with improvements to ADA accessibility, a new traffic signal system at North 4th, traffic signal upgrades at the 1-705 … Continue reading
Concourse D Common Use Enviroment Proj #104421 (Port of Seattle)
Description: The Work includes: installation of up to eleven (11) gates of common use passenger processing equipment and infrastructure, new casework, carpet, wall coverings, installation of POS provided seating, task lights and furnishings, and other associated work on Concourse D. … Continue reading
Alpac Elementary School Improvements (Auburn School District)
Description: The scope of work includes limited improvements to an existing wood framed elementary school building. Work includes, but is not limited to, modifications to an existing playshed, partial roofing replacement, athletic equipment, replacement of a gymnasium floor, window coverings, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 26-Electrical, 28-Elect.Saftey-Security, 32-Exterior Improvments Leave a comment
Petco Interbay Seattle, WA (Curt Faus Corp.)
Description: The project is a 15,000 sf Petco Retail tenant improvement to an existing shell. Scheduled start date is mid-April, 2012. Subcontractor must be licensed in the state of Washington. Work as shown on bid documents but not limited to Concrete, … Continue reading
Fortson Creek Culvert – Fish Barrier (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** SR 530, MP 42.91 to MP 43.05 in Snohomish County, Fortson Creek Culvert – Fish Barrier, by removing existing corrugated arched pipe, creek channel build up, clearing and grubbing, excavating, grading, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings Leave a comment
Clear Creek Falls-Rimrock Tunnel Vicinity-Stablize Slopes (Washington State Dept of Transportation)
Description: This Contract provides for the improvement of *** unstable slopes on US 12 between MP 154.31 to MP 154.41 and MP 164.95 to MP 165.06 in Yakima County, by clearing, rock slope scaling, debris removal, installing rock bolts and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
US 101 Overcrossing Seismic Retorfit (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** Bridge.s No. 8/104N & 8/104S on SR 8, MP 20.6 vicinity and Roadway Work on US 101, MP 361.4 vicinity, in Thurston County, by installing column jackets and performing other bridge … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
176th ST SE VIC To SR 96 Paving (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** SR 9, M.R 4.03 to M.P. 6.89 in Snohomish County, 176TH ST SE VIC TO SR 96 – PAVING, by planing bituminous pavement, paving with hot mix asphalt, traffic induction loops, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 05-Metals, 08-Openings, 09-Finishes Leave a comment
Bothell Community Church (Jansen Construction Co.)
Description: Ground up construction of an 80,406sf addition to the existing church. Three-story steel and light gauge metal frame construction. Steel truss. Vertical corrugated metal and split face cmu siding. Metal and single ply roofing. Vinyl windows. Associated site improvements. … Continue reading
UW – Fisheries Teaching & Research Building Envelope Improvements (University of Washington)
Description: The project includes the following work: site demolition including paving, stairs, landscaping, and site furnishings; excavation and backfill at the building foundation; shoring; a new storm drainage system; landscape restoration, including irrigation and site furnishings; demolition and replacement of … Continue reading
Eastern Region Chip Seal 2012 (Washington State Department of Transportation)
Description: This contract provides for the improvement of: 13.10 miles of US 2 in Lincoln County, MP 207.78 to 220.88;1 24.20 miles of SR 21 in Adams and Franklin Counties, MP 0.00 to 24.20; 21.57 miles of SR 26 in … Continue reading
Simpson Ave Bridge Remaining Pier 2 Stabilization (Washington State Department of Transportation)
Description: This contract provides for the improvement of *** US 101, by repairing the Hoquiam River (Simpson Avenue) Bridge No. 101/125W and one sidewalk location *** and other work, all in accordance with the attached Contract Plans, these Contract Provisions, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 05-Metals, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Bristol Fill Bridge Deck Replacement (Washington State Department of Tranportation)
Description: This Contract provides for the improvement of *** SR 10, MP 90.06 to MP 90.22, in Kittitas County, by removing portions of an existing bridge, fabricating, erecting and painting steel girders, forming, casting and curing a reinforced concrete bridge … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 02-Existing Conditions, 04-Masonry, 05-Metals, 06-Wood & Plastics, 08-Openings Leave a comment
SR 18 Interchange WB Bridge (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** I-90, in King County, MP 25.30 to 26.02, SR 18 Interchange WB Bridge, Bridge Deck Rehabilitation, by rehabilitating the existing I-90 WB bridge deck (Br. 90/78N), reconstructing bridge expansion joints, planing, … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 03-Concrete, 05-Metals, 06-Wood & Plastics, 08-Openings Leave a comment
Mounts Rd Vicinity to Berkley St. (Washington State Department of Transportation)
Description: This Contract provides for the improvement of *** I-5 in Pierce County, MP 116.70 to MP 122.13, I-5, Mounts Road Vicinity to Berkeley St – Median Barrier Replacement, by installing precast concrete median barrier, guardrail, traffic control, *** and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 06-Wood & Plastics, 08-Openings, 09-Finishes Leave a comment
Crosstown Pipeline Upper Reach Repair (City of Bremerton, WA)
Description: The work to be completed under this Contract generally consists of installing approximately 2400 feet of 36-inch diameter high-density polyethylene (HDPE) sewer main, rehabilitating 880 feet of 30-inch ductile iron sewer main with cure-inplace pipe (CIPP) technology, installing 700 … Continue reading
Evergreen Campus Teen Health Clinic (Healthpoint Community Health Centers)
Description: The work involves interior modifications to Building 200 at Evergreen Campus, originally constructed in 1954. The work includes, but is not limited to: demolition of existing interior partitions and finishes, slab cuts to run new plumbing, construction of new … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 22-Plumbing, 23-HVAC, 26-Electrical, 27-Communications, 28-Elect.Saftey-Security Leave a comment
Foss Superstructure Repairs
Description: Work includes but is not limited to the following: 1. Shoreline Community College – 5000 Building Improvements, FOSS Superstructure Repairs. 2. Demolition of existing concrete ramp, stair, landings and associated structure at southern entry of the 5,000 FOSS Building. … Continue reading
PW12-0027 Tacoma Landfill Stage 3 Closure- Central Area Ph 3
Description: This contract shall generally consist of closing an approximately 7 acre area of the Central Area of the Tacoma Landfill with an impermeable geosynthetic clay liner and a HDPE geomembrane. Installation of new landfill gas system piping and extraction … Continue reading
Edison Elementary School Playground Improvements – Phase 2 (Tacoma School Dist)
Description: The Work generally includes, but is not limited to the following: a. Site Work and Site Demolition: Demolition of existing paving, curbs, utilities and site features. Site clearing, grading and earthwork. Site paving, curbing, utility work, landscaping and irrigation, … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 12-Furnishings, 22-Plumbing, 26-Electrical, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments, 33-Utillities Leave a comment
City of Lacey Senior Center Expansion
Description: The major items of work include furnishing all materials, equipment, tools, labor, and other items incidental thereto for all the work necessary to complete the construction of approximately 5388 s.f. of new construction, and 5072 s.f. of existing building … Continue reading
Posted in Public, Washington Tagged 00-Procurement, 01-General, 02-Existing Conditions, 03-Concrete, 04-Masonry, 05-Metals, 06-Wood & Plastics, 07-Thermal & Moisture, 08-Openings, 09-Finishes, 10-Specialties, 11-Equipment, 12-Furnishings, 20-Mechanical, 21-Fire Suppression, 22-Plumbing, 23-HVAC, 28-Elect.Saftey-Security, 31-Earthwork, 32-Exterior Improvments Leave a comment
2011 Olympic Region Basic Safety Restoration (WSDOT-11C504)
Description: This Contract provides for the improvement of SR 8, SR 99, US 101, SR 165, and SR 167 in Clallam, Grays Harbor, Mason, Pierce, and Thurston counties by removing beam guardrail, guardrail anchors, and flexible guide posts, clearing and … Continue reading
Posted in Public, Washington Tagged 01-General, 02-Existing Conditions, 08-Openings, 09-Finishes Leave a comment



