US 395 NSC 2013 Demo 1 (WSDOT)
05-30-2013
05-22-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: 5/22/13, 9:00 am PST – MAP Description: The improvement of WSDOT owned properties within the City of Spokane at 115 S Ray, 203 S Green, 3708 E 3rd Avenue, 3723 E 4th venue, 3808 E 3rd Avenue, 3812 E 3rd Avenue, 4048 E 3rd Avenue, 461 6 E 4m Avenue, 511 9 E 5′h Avenue, 411 S McKinnon, 404 S Koren, 3628 E 3″ Avenue, 4120 E 3rd Avenue, 2210 E 3rd Avenue, 3709 E 4th Avenue and by abatement of asbestos materials, removal and disposal of buildings and contents, and removal of fencing. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Larry Larson, (509)...
US 2 Et Al 2013 Statewide Durable Striping (WSDOT)
06-05-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/5/13, 11:00 am PST Walk Thru: n/a Description: Durable striping in the six WSDOT regions of Washington state. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Jeff Minnick, (509) 577-1810 Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of Record is posted at the WSDOT Website under...
Olympic College International Student Services Hazelwood Library Renovation
06-04-2013
05-28-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 3:00 pm PST Walk Thru: 5/28/13, 9:00 am PST – Second Floor Conference Room, Connolly Facilities Service Building MAP Description: Interior renovation of a portion of the media center on the first floor of the existing Hazelwood Library. Estimated Project Value: $42,480 – $47,200 Price: $75 deposit, or free file download Refundable: Yes (if returned within 7 days of bid date) Check To: Rice Fergus Miller Architecture & Planning Project Contact: Ronald Easterday, (360) 377-8773, reasterday@rfmarch.com Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs View Plan Holders List Add...
Montesano High School Grandstand Replacement
06-04-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Walk Thru: 5/21/13, 1:00 pm PST – Montesano District Board Room, MAP Description: The Scope of Work is to replace the original grandstand destroyed by fire. The new grandstand will accommodate approximately 1,250 spectators, and include restrooms, storage and elevated press box. The structure consists of concrete foundations, steel superstructure, pre-cast concrete risers, glu-laminated wood roof and wood infill walls. Price: $100 deposit, or free file download Refundable: Yes Check To: Montesano School District Project Contact: Kris Stamon, (253) 383-3084 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206)...
CWU Roofing Replacement at Quigley Hall & Old Heating Plant
05-30-2013
05-21-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: 5/21/13, 10:30 am PST - Room 116, Jongeward Plant Services Building, MAP Description: The Work at Quigley Hall consists of, but is not necessarily limited to the following: 1. Remove existing 3-tab asphaltic shingle roofing system, including underlayment, metal flashing, and areas of copper roofing, organic growth, and debris. Existing materials are nailed/stapled to an existing sloped plywood deck. 2. Remove existing skylights, extend curbs, infill existing sundeck with new framings and deck, 3. Clean substrate deck, and other materials to which new roofing system is applied, to the satisfaction of the new roofing system...
South Granite Avenue Improvement Project – Phase III (Gray & Osborne)
05-28-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This Contract provides for the improvements of approximately 1,000 lineal feet of South Granite Avenue from the Southerly City limits to Wallace Street. The work includes, but is not limited to, excavation, pavement removal, grading, compaction, installation of concrete curbs, gutters, pervious concrete sidewalks, asphalt pavement, storm and water improvements, pavement markings, surface restoration, traffic control and other work all in accordance with the attached Contract Plans, these Special Provisions and the Standard Specifications. Bid Date: 5/28/13, 1:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $690,000 Price: Purchase Prints or...
Maury Island Marine Park Picnic Shelter
06-11-2013
06-04-2013
Oregon
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/11/13, 2:00 pm PST Walk Thru: 6/4/13, 9:00 am PST – MAP Description: King County Parks and Recreation requests proposals for construction of a picnic shelter at Maury Island Marine Park, 5405 SW 244th Street Vashon WA 98070. Work includes earthwork, concrete, structural steel, metal roofing, gutters and roof drains, no walls, no electrical or mechanical systems. Area approximately I000 square feet. No power or water is available at the site. Price: Purchase prints, or free file download Refundable: Yes; reimbursed if invoiced with bid Project Contact: Putnam Architects, (206) 463-6933 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206)...
Southeast 256th Street Improvements – Kent Kangley Road to 116th Avenue Southeast
05-29-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The project consists of widening approximately 3,400 lineal feet of SE 256th Street from Kent Kangley Road (SR 516) to 116th Avenue SE, from the existing two lanes to a three-lane roadway; including power undergrounding, curb, gutter, sidewalk, bicycle lanes, street lighting and limited water and sewer work. Approximately 3,600 linear feet of storm pipe as well as storm pond modifications is also included, along with approximately 7,500 tons of asphalt pavement, 5,750 linear feet of cement concrete curb and gutter, 4,785 square yards of cement concrete sidewalk and driveway and 7,450 tons of crushed surfacing. Bid Date: 5/29/13, 10:00 am PST Pre-Bid...
Exterior Painting at Landmark Apartments
05-23-2013
05-16-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Renovations include, but are not limited to, the preparation and painting of all previously painted surfaces at all buildings at Landmark Apartments, and other work described in project manual. Bid Date: 5/23/13, 2:30 pm PST Pre-Bid Meeting: 5/16/13, 3:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Sarah Anderson, saraha@kcha.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Exterior Painting at Landmark Apartments Seattle Daily Journal of Commerce – (Plan Center) Contact:...
Exterior Painting at Parkwood Apartments
05-23-2013
05-14-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Renovations include, but are not limited to, the preparation and exterior painting of all previously painted surfaces at all buildings, carports, sheds, dumpster enclosures and fencing at Parkwood Apartments, and other work described in project manual. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: 5/14/13, 2:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Sarah Anderson, saraha@kcha.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Exterior Painting at Parkwood Apartments Seattle Daily...
Transportation Maintenance Facility – Bellevue SD – Subcontractors Only – Burke Construction
06-06-2013
05-15-2013
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of a new 28,426 SF transportation maintenance facility while the existing 13,000 sf building remains in operation until demolished in a later phase. Bid Date: 6/6/13, 2:00 pm PST Pre-Bid Meeting: 5/15/13, 12:00 pm PST - MAP Estimated Cost: $9,500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this...
Roofing Replacement on Building 2 at Woodridge Park Apartments
05-29-2013
05-21-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Renovations include, but are not limited to, removal of roofing material, plywood (as necessary), and supply and installation of plywood, PVC roof system, tapered panels, flashing, drainage system, and accessories on Building 2 at Woodridge Park Apartments, and other work described in project manual. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: 5/21/13, 10:00 am PST - MAP Estimated Cost: $114,291 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Hugh Watkinson, hughw@kcha.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan...
2013 AAC/TIB North 105th Street and North Northgate Way – Rebid
05-29-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Full depth pavement reconstruction of the curb side lanes, grind and overlay of the center lanes including pavement base repair, new 5’ minimum wide sidewalks both sides of the street, drainage collection and conveyance, drainage flow control and water quality treatment, crosswalk improvements, new channelization, upgraded curb ramps, curbs, street lighting, signals and ITS work including push button upgrades, loops, advance detection, CCTV and LPR cameras and Dynamic Message Signs. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $9,200,000 Price: Purchase Prints or Free File Download Refundable: No Project...
Cascade View Elementary School Exterior Painting (Tukwila School District)
05-30-2013
05-16-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 3:30 pm PST Mandatory Walk Through: 5/16/13, 3:30 pm PST – MAP Description: Base bid includes preparation and painting of surfaces of existing stucco siding, masonry, downspouts, metal fences and gates, GWB soffits, plywood soffits, wood fascia, and wood trim. All prefinished metal flashings, gutters and windows frames shall be cleaned, but not painted. Preparation includes repair of cracked GWB soffits and stucco surfaces, cleaning of existing painted wall and ceiling surfaces, scraping of loose paint over masonry, scraping of paint at metal gates, removal and re-caulking as indicated, and limited repair of damaged masonry. Additive alternates...
City Center Reservoir – Ilwaco (Gray & Osborne)
05-29-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work under this Contract includes the demolition of the existing 250,000-gallon wood reservoir and portions of existing piping. Following demolition, the project includes sitework and construction of a new 500,000-gallon glass-lined bolted steel reservoir, site piping, electrical and telemetry, site restoration and all associated work as shown on the Plans and described in the Specifications. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Adam Miller, (206) 284-0860, grayosborne@g-o.com Addenda: To Be Determined Download PDFs Place Print...
Indian Creek Reservoir (Gray & Osborne)
05-29-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work shall consist of construction of the Indian Creek reservoir including sitework, site piping, a 159,000-gallon concrete reservoir, electrical and telemetry, site restoration and all associated work as shown on the Plans and described in the specifications. Bid Date: 5/29/13, 1:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Adam Miller, (206) 284-0860, grayosborne@g-o.com Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be...
Sea Mar Medical Office Building – Bazan Architects – Sub-Contractors Only
05-24-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of the shell and core for a two-story, medical office building with a basement. The building is steel framed with a concrete lateral restraint system. This project is targeting a LEED silver certification. The parking lot for the building is shared with an affordable housing building and is being constructed by another contractor under a separate contract. The interior tenant improvements will be performed by the owner/contractor’s crew. Subcontractor bids include, but are not limited to the following: Excavation and backfill for basement. Utility connections. Foundation and concrete work including shear walls. Waterproofing - foundation...
US 101 Purdy Canyon Vic. Slide Stabilized Scope (WSDOT)
05-22-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/22/13, 11:00 am PST Walk Through: n/a Description: The improvement of US 101 in Mason County, MP 339.85 to MP 340.71 by slope flattening to reduce or eliminate the rock fall potential by clearing & grubbing, roadway excavation incl. haul, seeding, fertilizing, and mulching, planting, temporary drainage, erosion and sediment control, and temporary traffic control. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Dennis Engel, (360) 570-6752, EngelD@wsdot.wa.gov Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add...
SR 20 Spur Friday Harbor Ferry Terminal Transfer Span Overlay (WSDOT)
05-22-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/22/13, 11:00 am PST Walk Thru: n/a Description: The improvement of the Friday Harbor Ferry Terminal, in San Juan County, by overlaying the transfer span. Price: Purchase Prints or Free File Download Refundable: No Project Contact: John Callahan, (206) 515-3755, Callajo@wsdot.wa.gov Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes ...
SR 20 Spur Friday Harbor and Orcas Ferry Terminals Dolphin Replacement (WSDOT)
05-30-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Through: n/a Description: The improvement of ferry terminals in San Juan County including the following: Orcas right inner dolphin replacement; Orcas floating dolphin anchor relocation and associated work; Friday Harbor main slip right intermediate dolphin replacement; Friday Harbor tie-up slip right intermediate dolphin replacement; Friday Harbor main slip counterweight cable replacement; Shaw counterweight cable replacement; and Miscellaneous dolphin and wingwall work at Friday Harbor. Price: Purchase Prints or Free File Download Refundable: No Project Contact: John Callahan, (206) 515-3755, Callajo@wsdot.wa.gov Addenda: To...
D Line RapidRide North Terminal
05-30-2013
05-22-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work under this Contract shall consist of supplying all labor, materials, equipment and services necessary for the site preparation and the construction of new, or the improvement of existing facilities within the jurisdiction of the City of Seattle, Washington. Work shall include, but is not limited to, clearing and grubbing, earthwork, curb and gutter, sidewalks, asphalt concrete paving, cement concrete paving, stormwater drainage systems, stormwater water quality and detention systems, street lighting, signage, pavement markings, landscaping and driveway restoration, work by utility owners, and other work shown on the Drawings. Bid Date: 5/30/13, 1:00 pm...
Seattle Municipal Tower (SMT) Glass Roof Improvement
06-05-2013
05-16-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Glass Roof Renovation at Seattle Municipal Tower floors 58 to 62, including but not limited to:a. Removal of existing elastomeric sealant at all vertical mullion caps. b. Removal and reinstallation of existing mullion caps throughout. c. Renovation of pressure plates and replacement of gaskets. d. Installation of elastomeric sealant and pre-formed silicon sealant renovations. 2. High Roof Gutter Assembly Renovation at Seattle Municipal Tower floor 58, including but not limited to: a. Surface prep and cementitious overlay at two existing concrete gutters. b. Replacement of sheet metal flashing and sealant renovation. c. Replacement of drain covers and...
Yakima County Jail Facility Upgrade
06-04-2013
05-23-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of improvements to Yakima County Jail located at 111 North Front Street, Yakima, WA., 98901. Work includes general, security systems, mechanical, plumbing and electrical work in accordance with plans and specifications prepared by DLR Group. A single lump sum bid is requested for all general, special systems, mechanical and electrical work. Bid Date: 6/4/13, 11:00 am PST Mandatory Pre-Bid Walk Through: 5/23/13, 10:00 am PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Erica Loynd, eloynd@dlrgroup.com Addenda: To Be Determined View/Download PDFs Place Print...
Maplewood Hts ES Re-roof
05-23-2013
05-16-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Walk Thru: 5/16/13, 2:00 pm PST – MAP Description: The replacement of existing asphalt shingle & built-up roofing, substrate & insulation as necessary, gutters, flashings, and downspouts. Provide new fall protection. Work also includes modifications to existing finishes to fit new work with the existing building. Price: $50 deposit, or free file download Refundable: Yes (if returned within 10 days of bid date) Check To: Renton School District Project Contact: Heidi Deaver, (206) 628-3137 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs View Plan Holders List Add...
SPSCC Stormwater Retrofit for Water Quality – Phase 2
05-29-2013
05-14-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/29/13, 3:00 pm PST Walk Through: 5/14/13, 2:30 pm PST – Building 26, Room 103 MAP Description: The project consists of the second phase of stormwater retrofit improvements at the South Puget Sound Community College campus. Construction activities include, but are not limited to, providing StormFilter treatment units, demolition of existing pavement surfacing systems, site clearing and grubbing, excavation, storm piping, water distribution piping and new pavement surfacing systems including curbing and landscaping. The project is located within the city of Olympia, Washington. Estimated Project Value: $410,000.00 to $450,000.00 Price: $50 deposit, or...
East Valley Elementary School Soil Remediation Work
05-23-2013
05-14-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 5:00 pm PST Mandatory Pre-Bid Meeting: 5/14/13, 1:30 pm PST – MAP Project Scope: Main project is East Valley Elementary Soil Remediation Work for East Valley School District No. 90. The site is located at 1951 Beaudry Road, Yakima, WA 98901 as indicated on Contract Documents prepared by Loofburrow Wetch Architects, P.S., 201 West Yakima Avenue, Yakima, Washington 98902. Price: $100 deposit, or free file download Refundable: Yes (if returned within 14 days of bid date) Check To: Loofburrow Wetch Architects Project Contact: Loofburrow Wetch Architects, (509) 457-5121 Addenda: We notify Plan Holders via Bid Caster Project Hosted by: ARC-Tacoma (253)...
2013 Thermoplastic Markings
05-21-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The project consists of installing 2,600 linear feet of plastic stop lines, 13,800 square feet of plastic crosswalk lines, 56 each of plastic carpool lane symbols, and 52 each of plastic railroad crossing symbols. Bid Date: 5/21/13, 10:45 am PST Pre-Bid Meeting: n/a Estimated Cost: $260,000 - $310,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Dave Brock, (253) 856-5658 Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: 2013 Thermoplastic Markings Seattle Daily Journal of Commerce – (Plan...
South Ridge Elementary School (Ridgefield, WA)
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work will include site work and first phase construction of a 20,000 SF one-story building to supplement existing Elementary School. Building will consist of six classrooms, learning lab, co-op area, multi-purpose commons with stage/music room, and kitchen. Classroom addition will be wood frame construction with brick veneer/fiber cement panels and plywood shear walls. Multipurpose commons will be CMU with brick veneer and fiber cement panels. Bid Date: varies by Bid Package Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Triplett Wellman...
RTC Bldg. I Roof Replacement
05-28-2013
05-15-2013
Washington
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/28/13, 3:00 pm PST Walk Thru: 5/15/13, 11:00 am PST – Building N, MAP Description: Following is a general description of the Work under this bid package1. All work as indicated on the plans and in the Project Manual 2. Demolish existing roof assembly (concrete tile, batons, underlayment) 3. Demolish gutters and rake flashings 4. Install new roof assemblies a. Coverboard (all roof areas) b. Self-adhering nieinbrane vapor barrier (all roof areas) c. Metal roofing (all roof areas) d. Insulation (selective roof areas) e. Purloins (selective roof areas) 5. Install new gutters, rake flashings and vented ridge cap 6. Reconnect existing downspouts Estimated Project...
Finn Hill Middle School Site and Utility Rework Package
06-04-2013
05-17-2013
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Revised Bid Date: 6/4/13, 10:00 am PST Walk Thru: 5/17/13, 1:00 pm PST – MAP Description: The work includes civil and landscaping, and all necessary and required work to complete the project as described in the contract documents. Price: GCs can obtain two sets without deposit; otherwise, purchase prints, or free file download Refundable: No Project Contact: Chris Geer, (425) 936-1183, cgeer@lwsd.org Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFsDownload Addendum No. 1 View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a...


