Posts Tagged "21-Fire Suppression"

OAME UO Straub Hall – Deferred Maintenance & Seismic Upgrade

»Posted on May 21, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: The base project consists of the full renovation and alterations to Straub Hall. There is an additional overlapping phase that includes the demolition of most of the first floor classroom spaces that occupy the courtyard, and the construction of a new classroom addition.  Price: Purchase prints, or free file download Refundable: No Project Contact: Matt Norman, matt.norman@fortisconstruction.com Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room...

read more

Olympic College International Student Services Hazelwood Library Renovation

»Posted on May 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 3:00 pm PST Walk Thru: 5/28/13, 9:00 am PST – Second Floor Conference Room, Connolly Facilities Service Building MAP Description: Interior renovation of a portion of the media center on the first floor of the existing Hazelwood Library. Estimated Project Value: $42,480 – $47,200 Price: $75 deposit, or free file download Refundable: Yes (if returned within 7 days of bid date) Check To: Rice Fergus Miller Architecture & Planning Project Contact: Ronald Easterday, (360) 377-8773, reasterday@rfmarch.com Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs View Plan Holders List Add This Project to...

read more

Montesano High School Grandstand Replacement

»Posted on May 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Walk Thru: 5/21/13, 1:00 pm PST – Montesano District Board Room, MAP Description: The Scope of Work is to replace the original grandstand destroyed by fire. The new grandstand will accommodate approximately 1,250 spectators, and include restrooms, storage and elevated press box. The structure consists of concrete foundations, steel superstructure, pre-cast concrete risers, glu-laminated wood roof and wood infill walls. Price: $100 deposit, or free file download Refundable: Yes Check To: Montesano School District Project Contact: Kris Stamon, (253) 383-3084 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order...

read more

OAME Lane Community College Bld 11 Remodel

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: Demolition, Cast-in-Place Concrete, Shotcrete, Precast Architectural Concrete, Unit Masonry, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Cable Railings, Rough Carpentry, Exterior Finish Carpentry, Interior Architectural Woodwork, Bentonite Waterproofing, Traffic Coatings, Water Repellants, Thermal Insulation, Weather Barriers, Standing-Seam Metal Roof Panels, Fiber-Cement Siding and Soffits, EPDM Roofing, Sheet Metal Flashing and Trim, Joint Sealants, Hollow Metal Doors and Frames, Flush Wood Doors, Aluminum Storefronts and Windows, Door Hardware, Glazing, Gypsum Board, Acoustical...

read more

Transportation Maintenance Facility – Bellevue SD – Subcontractors Only – Burke Construction

»Posted on May 14, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of a new 28,426 SF transportation maintenance facility while the existing 13,000 sf building remains in operation until demolished in a later phase. Bid Date: 6/6/13, 2:00 pm PST Pre-Bid Meeting: 5/15/13, 12:00 pm PST - MAP Estimated Cost: $9,500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...

read more

Expansion of the Pfriem Brewing Facility

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work includes build out of approximately 3,683 sq ft of warehouse space, expansion of 2 existing restrooms and new exterior work to include modifications to the existing parking lot, relocating 2 Van Accessible parking stalls, building a new outdoor seating area, new storefront glazing and entry door, new exterior canopy as noted on contract documents. Bid Date: 5/30/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/17/13, 2:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: (503) 227-8100, garyh@orangewallstudios.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List:...

read more

Sea Mar Medical Office Building – Bazan Architects – Sub-Contractors Only

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of the shell and core for a two-story, medical office building with a basement. The building is steel framed with a concrete lateral restraint system. This project is targeting a LEED silver certification. The parking lot for the building is shared with an affordable housing building and is being constructed by another contractor under a separate contract. The interior tenant improvements will be performed by the owner/contractor’s crew. Subcontractor bids include, but are not limited to the following: Excavation and backfill for basement. Utility connections. Foundation and concrete work including shear walls. Waterproofing - foundation and exterior...

read more

Yakima County Jail Facility Upgrade

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of improvements to Yakima County Jail located at 111 North Front Street, Yakima, WA., 98901. Work includes general, security systems, mechanical, plumbing and electrical work in accordance with plans and specifications prepared by DLR Group. A single lump sum bid is requested for all general, special systems, mechanical and electrical work. Bid Date: 6/4/13, 11:00 am PST Mandatory Pre-Bid Walk Through: 5/23/13, 10:00 am PST -  MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Erica Loynd, eloynd@dlrgroup.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List:...

read more

Yeon Shops West Front Structural

»Posted on May 9, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/20/13, 9:00 am PST - Columbia Conference Room, Annex Building MAP Description:  Remove existing west canopy including concrete roof and soil overburden. Install new steel canopy, deck and metal roof assembly. Repair damaged masonry walls. Price: Purchase prints, or free file download Refundable: No Project Contact: Paula Rickman, 503-988-5111 Ext. 24380, paula.j.rickman@multco.us Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact...

read more

South Ridge Elementary School (Ridgefield, WA)

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work will include site work and first phase construction of a 20,000 SF one-story building to supplement existing Elementary School. Building will consist of six classrooms, learning lab, co-op area, multi-purpose commons with stage/music room, and kitchen. Classroom addition will be wood frame construction with brick veneer/fiber cement panels and plywood shear walls. Multipurpose commons will be CMU with brick veneer and fiber cement panels. Bid Date: varies by Bid Package Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Triplett Wellman Contractors, 503-982-4188, tim@triplettwellman.com Addenda: To Be Determined...

read more

Washington Elementary School Additions & Modernization

»Posted on May 3, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Mandatory Walk Through: 5/14/13, 4:00 pm PST – MAP Description: Provide all work and materials to complete all general, temporary facilities, demolition, hazardous material abatement, architectural, civil, landscape, structural, mechanical and electrical work under a single general contract for the construction of Washington Elementary School Additions and Modernization, located at 3701 N 26th St, Tacoma, Washington, including site work therefore, for Tacoma School District No. 10, all as shown and described in the Contract Documents prepared by BLRB Architects. Estimated Project Value: $18,200,000 Price: $200 deposit, or free file download...

read more

PCC BP4B – Student Center (Portland Community College)

»Posted on May 3, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Pre-Bid Meeting: 5/7/13, 9:00 am PST – Large Conference Room, MAP Description: Numerous bid items, including: Metals, Drywall, Architectural Woodwork, Openings, Overhead Coiling Doors, Folding Fire Doors, Interior All-Glass Entrances, Storefronts and Glazing, Tiling, Flooring, Painting, Specialties, Toilet Compartments, Operable Folding Panel Partitions, Food Equipment – see RFP/Specs for complete description. Price: Purchase prints, or free file download Refundable: No Project Contact: Mark Matthews, mark@pacificmarkconstruction.com Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download...

read more

Remodel at the CWI Nampa Campus Academic Building-Chemistry Lab

»Posted on May 1, 2013 in Idaho, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Remodel of existing third floor art classroom, alcove, and art storage room into a chemistry lab with Chemistry Office, Chemistry Storage, and Chemistry Storage/Prep Rooms. The existing building is IBC Type II-A Construction, and no additional area is being added to the facility. The area of the Remodel is approximately 1745 sf. The Scope of the work includes demolition; cutting and patching; structural steel; plastic-laminate-faced architectural cabinets; roof patching; patching of existing SFRM; joint sealants; doors and frames; door hardware; exterior and interior painting; high-performance concrete floor finish; interior finishes; specialties;...

read more

Safeway 1135 Cle Elum – Subcontractors Only – In Store Services, Inc

»Posted on May 1, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/17/13, 10:00 am PST Walk Thru: n/a Description: The Work consists of all, labor, equipment, appliances, materials, products, systems structure, finishes, accessories, furnishings, specialties, special construction, taxes, sales taxes, transportation, facilities and services, overhead and profit necessary for and/or reasonably incidental to the entire (100%) completion of the “Safeway Store” including but not limited to site development work, architectural, structural, mechanical, and electrical work, all as shown and described in the contract documents dated April 19, 2013 including the Drawings and the Project Manual entitled “Safeway Store #1135, Lifestyle...

read more

Rocky Ridge Elementary School Improvements

»Posted on Apr 30, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/21/13, 10:00 am PST Walk Thru: 5/9/13, 10:00 am PST – MAP Description: The Work consists of: Installing partition walls to enclose existing open library. Repositioning selected mechanical grilles and light fixtures. Providing HVAC controls. Construction of new canopy at main entrance. Price: $100 deposit for general and prime contractors; otherwise, purchase prints or free file download Refundable: Yes (if returned within 10 days of bid date) Project Contact: Jay Peterson, Erickson McGovern, (253) 531-0206 Check To: Bethel School District Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFsDownload Addendum...

read more

Fire Station 20 (City of Seattle)

»Posted on Apr 30, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The scope of this project includes the construction of a new City of Seattle Fire Station 20 of approximately 10,000 gsf designed to meet LEED Platinum requirements. Site demolition includes some utilities, landscaping, trees, rockery, concrete retaining walls, pavement, walkways, paths and stairs. Building demolition includes the removal of (2) existing structures; a vacant 2-story commercial structure and a vacant 1-story former dry cleaning structure. Demolition includes remediation of hazardous materials including asbestos, lead, PCB and Mercury and removal of any unknown subsurface tanks or structures. Site work includes but is not limited to the following: SDOT...

read more

Central Peninsula Hospital Obstetrics, Infusion Wound Care Departments Renovations

»Posted on Apr 25, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Approximately 2600 square feet of renovation, window replacement, medical gas system upgrades, and other minor improvements in various locations inside of the Central Peninsula Hospital.  UPDATED Bid Date: 5/8/13, 2:00 pm local time Pre-Bid Meeting: 4/30/13, 10:00 am local time - KPB Conference Room, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: John Hedges, (907) 262-9657 Addenda: To Be Determined Download PDFsDownload Addendum No. 1Download Addendum No. 2  Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.  ...

read more

Finch Elementary School – Sub Bids Only – Burke Construction Group

»Posted on Apr 25, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Project consists of the modernization of and addition to an historic elementary school in a residential neighborhood next to an actively used neighborhood park. Bid Date: 5/14/13, 2:00 pm PST Pre-Bid Meeting: n/a Project Address: Finch Elementary School, Spokane, WA Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...

read more

Liberty High School Addition & Modernization Phase 3

»Posted on Apr 25, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Liberty High School is an existing educational 9th – 12th grade facility. Phase 3 includes, replacing the existing classrooms and library with 27 new classrooms and library, remodeling 5 existing science classrooms, 4 classrooms, 3 shop spaces, updating the existing gymnasium acoustics, miscellaneous exterior finish improvements and completing 6 tennis courts. The current building construction types include II-A, V-A, and V-B with sprinklers throughout. The new construction will be type V-B and the buildings occupancy will be group E with sprinklers throughout and area separations. Site work includes trenching for utilities, completing parking and driveway paving,...

read more

Sea Mar Des Moines Housing

»Posted on Apr 24, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/24/13, 4:00 pm PST Walk Thru: n/a Description: Construction of a three-story, 43 unit affordable apartment building. The project includes a parking lot for 86 cars and associated storm water work and street improvements adjacent to the site. Price: Purchase prints, or free file download Refundable: No Project Contact: Bazan & Associates Architects, Inc., 425-637-0831 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs Download Addendum No. 1View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes Add...

read more

Safeway 3472 Factoria, Bellevue – Subcontractors Only – In Store Services, Inc

»Posted on Apr 19, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Lifesyte Lite remodel; see specs for complete details. Bid Date: 4/22/13, 2:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $1,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Pat Gauthier, 206-682-3934; bids to: mlavell@storeservices.net Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest Contractors Network (NWCN) is not liable for the Contract Posts and provides these posts for informational purposes only....

read more

Pasco School District – Elementary School #13

»Posted on Apr 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: A new 2 story building consisting of 72,000 square feet, including Site Work, Structures, Finishes, Fire Protection, Mechanical, and Electrical work. Bid Date: 5/2/13, 2:00 pm PST Pre-Bid Site Visit: 4/18/13, 2:00 pm PST - 6202 Road 52, MAP Estimated Cost: $16,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Design West Architects, 509-783-2244 Addenda: To Be Determined Download PDFs Download Addendum No. 1Download Addendum No. 2 Download Bid Results Place Print Order View Plan Holders List Plan Holders List: Pasco School District – Elementary School #13   Burke Construction – (General Contractor) Contact:...

read more

PCC, Cascade Campus – Phase 1 – BP4A – Academic Building

»Posted on Apr 9, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. UPDATED Bid Date: 5/8/13, 2:00 pm PST Pre-Bid Meeting: 4/12/13, 9:00 am PST – Room No. 122, MAP Description: The Work includes includes two structures built over a podium of parking which is located below grade. The site is bounded to the north by North Jessup Street, with North Albina Avenue to the east and North Mississippi Avenue to the west. The southern boundary of the site is a property line immediately north of a series of low-rise commercial properties fronting North Killingsworth Street. Prior to this development the site has been actively used as surface parking by PCC. The underground parking garage will accommodate 210 vehicles. Access ramps to the garage will be...

read more

PW13-0188F Marine Security Operations Center – City of Tacoma (Fire Station 5)

»Posted on Apr 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/7/13, 11:00 am PST Walk Thru: 4/18/13, 10:00 am PST – Room 708 MAP Project Scope: The project will provide improvements to the Marine Security Operations Center (MSOC), located at 3301 Ruston Way, Tacoma. WA. Major components of the project include: Removal of a portion of the existing pier and piles, Installation of a new float system and gangway for moorage of emergency service vessels. Structural improvements to the existing building and pier structure, and remodel of the station for joint public safety use. Addition of a new upland apparatus bay and site improvements for an emergency service vehicle. Estimated Project Value: $3,040,000 Price: Purchase prints,...

read more

Mason County Shelter – Homeless Shelter

»Posted on Apr 1, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/23/13, 2:00 pm PST Walk Thru: n/a Description: Mason County Shelter will receive bids from General Contractors for the construction of a new community facility to serve as an emergency shelter project consisting of 7 studio units and associated common areas. Estimated Project Value: $1,100,000 Price: Purchase prints, or free file download Refundable: No Project Contact: Christopher Palms, (206) 787-1371, cpalms@eworks.org Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFsDownload Addendum No. 1Download Addendum No. 2 View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project...

read more

Shelton Creek Apartments

»Posted on Apr 1, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/23/13, 2:00 pm PST Walk Thru: n/a Description: Mason County Shelter will receive bids from General Contractors for the construction of a new 2-story wood frame multi-family housing project consisting of 8 units. Estimated Project Value: $800,000 Price: Purchase prints, or free file download Refundable: No Project Contact: Christopher Palms, (206) 787-1371, cpalms@eworks.org Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFsDownload Addendum No. 1 Download Addendum No. 2View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name *...

read more

Bethel Middle School Cafeteria Addition and Exterior Improvements

»Posted on Mar 26, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/17/13, 2:00 pm PST Walk Thru: 4/3/13, 10:00 am PST – MAP Description: Complete modernization and addition to the existing Cafeteria. Construction Type: V-A. Exterior Improvements. Outside improvements include: Cleaning, restoring, sealing and anti-graffiti coating applications to all exterior  masonry. Provide a new roof system to the entire existing and new school facility. Price: $300 refundable for GCs and Prime Contractors; otherwise, purchase prints  or free file download Refundable: Yes, for GCs and Prime Contractors Check To: Bethel School District Project Contact: Rob More, Erickson McGovern Architects, (253) 531-0206 Addenda: To Be Determined Project...

read more

KCHA Fitness Center Tenant Improvements (King County Housing Authority)

»Posted on Mar 21, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/18/13, 2:00 pm PST Walk Thru: 4/3/13, 1:00 pm PST – MAP Description: Tenant improvement construction of a fitness center in approximately 1,722 SF commercial space below occupied residential apartments. Provide labor, materials, tools, equipment for minor structural, MEP, HVAC, communication, fire suppression, interior finishes, and build to spec per design and drawings. Project is located at the corner of 8th Avenue SW and Roxbury Avenue, Seattle, WA in the White Center area. Estimated Project Value: $220,000 Price: $75 deposit, or free file download Refundable: Yes Check To: King County Housing Authority Project Contact: Grazyna Krewin, (206)...

read more

Rainier School Cottages Remodel and Renovation

»Posted on Mar 14, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/4/13, 3:00 pm PST Walk Thru: 3/26/13, 2:00 pm PST – MAP Description: The Work consists of improvements to seven existing mental health institutional cottages including, but not limited to: Renovation and expansion of toilet and shower room facilities. Renovation and expansion of kitchens. Reconfiguration of office, medication and associated support spaces. Replacement of selected floor, wall and ceiling finishes. Repair and replacement of selected roof areas. Repair of existing exterior stucco finishes at selected locations. Plumbing and HVAC upgrades and repairs at selected building areas. Electrical and low voltage improvements. Replacement of the staff duress...

read more

SW 86th Avenue Pump Station and Appurtenances

»Posted on Mar 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Contract includes the construction of the SW 86th Avenue Pump Station and Appurtenances and the replacement of four submersible pumps and discharge piping at the existing Fanno Basin (FABA) pump station. Updated Bid Date: 4/25/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 3/21/13, 10:00 am PST - MAP Estimated Cost: $14,500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Kelly Davis-McKernan, 503-823-7574, Kelly.Davis-McKernan@portlandoregon.gov Addenda: To Be Determined Download PDFsDownload Addendum No. 1 Download Addendum No. 2 Download Addendum No. 3Download Addenda Nos. 4, 5, & 6 Place Print Order View Plan Holders List No Plan...

read more