US 395 NSC 2013 Demo 1 (WSDOT)
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: 5/22/13, 9:00 am PST – MAP Description: The improvement of WSDOT owned properties within the City of Spokane at 115 S Ray, 203 S Green, 3708 E 3rd Avenue, 3723 E 4th venue, 3808 E 3rd Avenue, 3812 E 3rd Avenue, 4048 E 3rd Avenue, 461 6 E 4m Avenue, 511 9 E 5′h Avenue, 411 S McKinnon, 404 S Koren, 3628 E 3″ Avenue, 4120 E 3rd Avenue, 2210 E 3rd Avenue, 3709 E 4th Avenue and by abatement of asbestos materials, removal and disposal of buildings and contents, and removal of fencing. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Larry Larson, (509) 324-6091, LARSOLR@wsdot.wa.gov Addenda: To Be...
US 2 Et Al 2013 Statewide Durable Striping (WSDOT)
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/5/13, 11:00 am PST Walk Thru: n/a Description: Durable striping in the six WSDOT regions of Washington state. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Jeff Minnick, (509) 577-1810 Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of Record is posted at the WSDOT Website under the Proposal/Plan Holders Lists. You must order plans & specs from the state to be on this plan Holders List. Project Update Notification If you would like to be...
Olympic College International Student Services Hazelwood Library Renovation
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 3:00 pm PST Walk Thru: 5/28/13, 9:00 am PST – Second Floor Conference Room, Connolly Facilities Service Building MAP Description: Interior renovation of a portion of the media center on the first floor of the existing Hazelwood Library. Estimated Project Value: $42,480 – $47,200 Price: $75 deposit, or free file download Refundable: Yes (if returned within 7 days of bid date) Check To: Rice Fergus Miller Architecture & Planning Project Contact: Ronald Easterday, (360) 377-8773, reasterday@rfmarch.com Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs View Plan Holders List Add This Project to...
Montesano High School Grandstand Replacement
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Walk Thru: 5/21/13, 1:00 pm PST – Montesano District Board Room, MAP Description: The Scope of Work is to replace the original grandstand destroyed by fire. The new grandstand will accommodate approximately 1,250 spectators, and include restrooms, storage and elevated press box. The structure consists of concrete foundations, steel superstructure, pre-cast concrete risers, glu-laminated wood roof and wood infill walls. Price: $100 deposit, or free file download Refundable: Yes Check To: Montesano School District Project Contact: Kris Stamon, (253) 383-3084 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order...
Oxbow Park Septic Services
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The contract contemplated consists of providing wastewater system inspection, monitoring, testing, maintenance and sampling at Oxbow Park. The selected contractor will: • On a quarterly basis, perform wastewater system inspection, monitoring, lab testing, maintenance and take samples. • Repair problems in septic system if necessary. • Prepare and submit a quarterly wastewater system monitoring report to Metro. • Prepare and submit to DEQ, and copy Metro, any required wastewater permit report (e.g. WPCF Permit) and any necessary documentation. The term of the contract is anticipated to be May 2013 through April 2014. Contract may be renewed or extended for four (4)...
Clairmont Way Waterline Replacement and Pavement Rehabilitation
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Furnish, install and remove temporary traffic control devices and temporary erosion control measures. Complete 10” water line installation. Replacement of existing water services and fire hydrants. Complete roadway asphalt pavement rehabilitation by means of full depth roadway reconstruction, cement treatment, cold plane asphalt pavement removal and inlay and asphalt pavement overlay. Restore striping and signing. Perform additional and incidental Work as called for by the Specifications and Plans. Bid Date: 6/11/13, 2:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Ken Valentine, 503-221-1131 Addenda: To Be...
Willow Lake Drive Upgrade
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Matanuska-Susitna Borough is soliciting bids from qualified contractors to provide labor, equipment and material to reconstruct approximately 9,836 linear feet of Willow Lake Drive, Lakeshore Drive, Stormybrook Drive, and Sunnybrook Way near Mile 69 Parks Highway, Willow Alaska. This project will upgrade the existing gravel roadways to MSB residential road standards. This work will involve, but is not limited to 0.8 acres Clearing and Grubbing, 8,759 CY Unclassified Excavation, 13,738 CY Borrow, Type A, 6,292 tons Aggregate Base Course, Grading D-1, and 2,918 tons Asphalt Concrete, Type II, Class B. Additional items include drainage improvements, signage, striping,...
ADA Improvements at Chugach Manor Housing Complex
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Modify the living units, common areas, entry areas, and routes of travel to bring Units A 101, A 102, A 103, B107, D107, and D109 into ADA compliance. Bid Date: 6/13/13, 2:00 pm local time Pre-Bid Meeting: 5/28/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Greg Rochon, (907)330-8191, submittals@ahfc.us Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: ADA Improvements at Chugach Manor Housing Complex Seattle Daily Journal of Commerce – (Plan Center) Contact: Ken Elliott Address: 83 Columbia St Seattle, WA 98104 Contact by: P.2066228272 F....
Crawl Space Mechanical Upgrades at Parkview Manor Housing Complex
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work shall include furnishing all labor, materials, equipment, supervision of labor, and performance of all operations required to completely install satisfactorily operating mechanical and plumbing systems as defined in the Technical Specifications and on the Drawings. Major items of work include, but are not limited to, the installation of the following systems: 1) water supply system, and 2) plumbing. Bid Date: 6/6/13, 2:00 pm local time Pre-Bid Meeting: 5/24/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Greg Rochon, (907)330-8191, submittals@ahfc.us Addenda: To Be Determined View/Download PDFs Place...
Exterior Insulation Finishing System Repairs, Phase II – Antoinette Hatfield Hall
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Proposed work is to be performed in the alleyway between the facility and the First Congregational Church next door as well as in a mechanical well adjacent to the alley. Scope of work is the removal and replacement of the EIFS, all associated flashings and doors in the outlined work area. A more detailed scope of work and specifications are provided in Attachments A and B. Bid Date: 6/5/13, 2:00 pm PST Pre-Bid Meeting: 5/22/13, 9:00 am PST - Main Lobby, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Julie Hoffman, 503-797-1648, bidsandproposals@oregonmetro.gov Addenda: To Be Determined View/Download PDFs Place Print Order View Plan...
Roof Repair on Halls C and D at Portland Expo Center
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Metro is soliciting bids including all labor, materials, tools, equipment, and services necessary for roof repairs at several areas on Exhibit Halls C and D of the Portland Expo Center (EXPO) as defined by this request for bids (RFB). Work will consist of two (2) different Roof Systems detailed below (see specs) and a coating of the existing Hall C roof. Installation is to be as per Manufacturer’s specifications. Location of work areas for each method shown on attached Portland Expo Center Partial Site Plan Google-earth Map (Attachment A). The Portland Expo Center is located at 2060 N. Marine Drive, 97217. Contractor is responsible for field measuring EXPO designated...
K13352 SH-21, Idaho City NCL to Mores Cr Summit (Idaho Transportation Department)
Posted For Informational Purposes Only Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm MT Walk Thru: N/A Description: The work of placing a surface treatment, frost heave repair, soft spot repair, micro milling, delineation, and pavement markings on SH-21 from MP 39.0 to MP 52.33. Price: $5.00 Purchase Price or Free File Download Refundable: No Project Contact: Bryon Breen, (208) 334-8937 Phone Orders: to (800) 732-2098 (in Idaho) or (208) 334-8430 shall be made by credit card (Visa or Mastercard). Written requests shall be made by check or money order to the Idaho Transportation Department, Attn: Revenue Operations, P. O. Box 34, Boise, ID 83731-0034. Addenda: Emailed Updates - Bidder Purchase Host:...
CWU Roofing Replacement at Quigley Hall & Old Heating Plant
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: 5/21/13, 10:30 am PST - Room 116, Jongeward Plant Services Building, MAP Description: The Work at Quigley Hall consists of, but is not necessarily limited to the following: 1. Remove existing 3-tab asphaltic shingle roofing system, including underlayment, metal flashing, and areas of copper roofing, organic growth, and debris. Existing materials are nailed/stapled to an existing sloped plywood deck. 2. Remove existing skylights, extend curbs, infill existing sundeck with new framings and deck, 3. Clean substrate deck, and other materials to which new roofing system is applied, to the satisfaction of the new roofing system manufacturer...
K12866 K12867 UPRR E Lateral Cnl Br & Northside Blvd Opass IC (Idaho Transportation Department)
Posted For Informational Purposes Only Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm MT Walk Thru: N/A Description: The work of bridge deck replacement (westbound) and bridge rehabilitation (eastbound) on 1-84, MP 35.222 to MP 35.232 & bridge deck replacement (eastbound) and bridge rehabilitation (westbound) on 1-84, MP 34.952 to MP 34.965. Price: $5.00 Purchase Price or Free File Download Refundable: No Project Contact: Shawna King, (208) 459-7429 Phone Orders: to (800) 732-2098 (in Idaho) or (208) 334-8430 shall be made by credit card (Visa or Mastercard). Written requests shall be made by check or money order to the Idaho Transportation Department, Attn: Revenue Operations, P. O. Box 34, Boise,...
South Granite Avenue Improvement Project – Phase III (Gray & Osborne)
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This Contract provides for the improvements of approximately 1,000 lineal feet of South Granite Avenue from the Southerly City limits to Wallace Street. The work includes, but is not limited to, excavation, pavement removal, grading, compaction, installation of concrete curbs, gutters, pervious concrete sidewalks, asphalt pavement, storm and water improvements, pavement markings, surface restoration, traffic control and other work all in accordance with the attached Contract Plans, these Special Provisions and the Standard Specifications. Bid Date: 5/28/13, 1:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $690,000 Price: Purchase Prints or Free File Download...
Maury Island Marine Park Picnic Shelter
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/11/13, 2:00 pm PST Walk Thru: 6/4/13, 9:00 am PST – MAP Description: King County Parks and Recreation requests proposals for construction of a picnic shelter at Maury Island Marine Park, 5405 SW 244th Street Vashon WA 98070. Work includes earthwork, concrete, structural steel, metal roofing, gutters and roof drains, no walls, no electrical or mechanical systems. Area approximately I000 square feet. No power or water is available at the site. Price: Purchase prints, or free file download Refundable: Yes; reimbursed if invoiced with bid Project Contact: Putnam Architects, (206) 463-6933 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View /...
OAME Lane Community College Bld 11 Remodel
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: Demolition, Cast-in-Place Concrete, Shotcrete, Precast Architectural Concrete, Unit Masonry, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Cable Railings, Rough Carpentry, Exterior Finish Carpentry, Interior Architectural Woodwork, Bentonite Waterproofing, Traffic Coatings, Water Repellants, Thermal Insulation, Weather Barriers, Standing-Seam Metal Roof Panels, Fiber-Cement Siding and Soffits, EPDM Roofing, Sheet Metal Flashing and Trim, Joint Sealants, Hollow Metal Doors and Frames, Flush Wood Doors, Aluminum Storefronts and Windows, Door Hardware, Glazing, Gypsum Board, Acoustical...
Southeast 256th Street Improvements – Kent Kangley Road to 116th Avenue Southeast
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The project consists of widening approximately 3,400 lineal feet of SE 256th Street from Kent Kangley Road (SR 516) to 116th Avenue SE, from the existing two lanes to a three-lane roadway; including power undergrounding, curb, gutter, sidewalk, bicycle lanes, street lighting and limited water and sewer work. Approximately 3,600 linear feet of storm pipe as well as storm pond modifications is also included, along with approximately 7,500 tons of asphalt pavement, 5,750 linear feet of cement concrete curb and gutter, 4,785 square yards of cement concrete sidewalk and driveway and 7,450 tons of crushed surfacing. Bid Date: 5/29/13, 10:00 am PST Pre-Bid Meeting: n/a...
Soldotna Police Department Roof Replacement
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Remove existing inverted roof membrane assembly (IRMA) and install a new ethylene propylene diene monomer (EPDM) rubber roof assembly per plan and specifications. New installation includes framing, flashing, finishing insulation, mechanical, drainage and electrical. Removal of existing roof will include salvage and delivery of selected roof materials per plans and specifications. Bid Date: 6/4/13, 3:00 pm local time Pre-Bid Meeting: 5/23/13, 10:00 am local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: k.kornelis@ci.soldotna.ak.us Addenda: To Be Determined Download PDFs Place Print Order View Plan Holders List Plan Holders...
Exterior Painting at Landmark Apartments
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Renovations include, but are not limited to, the preparation and painting of all previously painted surfaces at all buildings at Landmark Apartments, and other work described in project manual. Bid Date: 5/23/13, 2:30 pm PST Pre-Bid Meeting: 5/16/13, 3:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Sarah Anderson, saraha@kcha.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Exterior Painting at Landmark Apartments Seattle Daily Journal of Commerce – (Plan Center) Contact: Ken Elliott Address: 83 Columbia St Seattle, WA 98104 Contact by:...
Exterior Painting at Parkwood Apartments
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Renovations include, but are not limited to, the preparation and exterior painting of all previously painted surfaces at all buildings, carports, sheds, dumpster enclosures and fencing at Parkwood Apartments, and other work described in project manual. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: 5/14/13, 2:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Sarah Anderson, saraha@kcha.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Exterior Painting at Parkwood Apartments Seattle Daily Journal of Commerce – (Plan Center) Contact: Ken Elliott Address:...
Transportation Maintenance Facility – Bellevue SD – Subcontractors Only – Burke Construction
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of a new 28,426 SF transportation maintenance facility while the existing 13,000 sf building remains in operation until demolished in a later phase. Bid Date: 6/6/13, 2:00 pm PST Pre-Bid Meeting: 5/15/13, 12:00 pm PST - MAP Estimated Cost: $9,500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message. Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...
Expansion of the Pfriem Brewing Facility
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work includes build out of approximately 3,683 sq ft of warehouse space, expansion of 2 existing restrooms and new exterior work to include modifications to the existing parking lot, relocating 2 Van Accessible parking stalls, building a new outdoor seating area, new storefront glazing and entry door, new exterior canopy as noted on contract documents. Bid Date: 5/30/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/17/13, 2:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: (503) 227-8100, garyh@orangewallstudios.com Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List:...
K13029 SH-52 FY13 Payette & Gem Co Overlay (Idaho Transportation Department)
Posted For Informational Purposes Only Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm MT Walk Thru: N/A Description: The work of 0.20' HMA overlay with SAFLEA interlayer, from MP 14.42 to MP 26.00 and a straight 0.15' HMA overlay, from MP 26.00 to R/LP 30.42 011 SH-52, a 0.1 5' overlay on SH- 16 from MP 12.47 to MP 13.93, guardrail replacement, soft spot repair, and ADA ramp retrofit. Price: $5.00 Purchase Price or Free File Download Refundable: No Project Contact: Shawna King, (208) 459-7429 Phone Orders: to (800) 732-2098 (in Idaho) or (208) 334-8430 shall be made by credit card (Visa or Mastercard). Written requests shall be made by check or money order to the Idaho Transportation Department, Attn:...
Roofing Replacement on Building 2 at Woodridge Park Apartments
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Renovations include, but are not limited to, removal of roofing material, plywood (as necessary), and supply and installation of plywood, PVC roof system, tapered panels, flashing, drainage system, and accessories on Building 2 at Woodridge Park Apartments, and other work described in project manual. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: 5/21/13, 10:00 am PST - MAP Estimated Cost: $114,291 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Hugh Watkinson, hughw@kcha.org Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List Plan Holders List: Roofing Replacement on Building 2 at Woodridge Park...
Alder Street: 18th Avenue to 24th Avenue (Eugene, OR)
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: 400 HRS Flaggers; 1,400 CY General Excavation; 6,600 SF Cold Plane PVMT Removal, 2” Deep; 84 FT 10” C900 Storm Pipe; 4 EA Catch Basin W/Bicycle Grate; 6,200 SY In Place Cement Treated Base; 240 TON Portland Cement; 6,200 SY Lime Subgrade Treatment; 90 TON Lime; 2,300 TON Level 2, 1/2” Dense WMAC W/35% Binder Replacement; 130 TON Level 2, ½” Dense HMAC; 460 SY Plain Concrete PVMT, Dowelled, 9” Thick; 1,600 FT Concrete Curb & Gutter; 4,820 SF Concrete Walks; 360 SF Truncated Domes; 78 SF Retrofit Truncated Domes on Existing Ramps;1 LS Thermoplastic, Non-Profile, 90 Mil, Extruded; 10 EA PVMT Legend, Type B-HS: Bike Sharrow; 2 EA Bike Lane Loop Detector Installation....
2013 AAC/TIB North 105th Street and North Northgate Way – Rebid
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Full depth pavement reconstruction of the curb side lanes, grind and overlay of the center lanes including pavement base repair, new 5’ minimum wide sidewalks both sides of the street, drainage collection and conveyance, drainage flow control and water quality treatment, crosswalk improvements, new channelization, upgraded curb ramps, curbs, street lighting, signals and ITS work including push button upgrades, loops, advance detection, CCTV and LPR cameras and Dynamic Message Signs. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $9,200,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Miguel Beltran,...
Eagles Edge Subdivision Water System Improvements, Phase I – LID 97
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This Project consists of reconstruction of Chatham Drive. The WORK consists of installation of new water and storm drainage systems, some sanitary sewer reconstructions, curb and gutter, replacement of the roadway embankment to a depth of 24 inches, shot rock borrow, shot rock with base course, new asphalt pavement, paved sidewalk, and miscellaneous related WORK. Bid Date: 5/28/13, 2:00 pm local time Pre-Bid Meeting: 5/17/13, 10:00 am local time - CBJ Engineering Department, 3rd Floor Conference Room, Marine View Center - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Jennifer Mannix, (907) 586-0873, jennifer_mannix@ci.juneau.ak.us...
Taku Dock Reconfiguration
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This WORK for this project consists of all activities necessary to construct the Taku Dock reconfiguration project as shown in the contract documents. The WORK is generally described as all activities necessary to demolish a portion of the existing Taku Dock, drive piles and expand existing dock, install concrete deck, install new fender piles, reinstall ladders, relocate existing crane, connect electrical power to the relocated crane, and other related work as shown on the plans. Bid Date: 5/29/13, 2:00 pm local time Pre-Bid Meeting: 5/15/13, 10:00 am local time - CBJ Engineering Department, 3rd Floor Conference Room, Marine View Center - MAP Price: Purchase Prints or...
Air Supported Fabric Structure for Portland Tennis Center
Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The successful Bidder shall fabricate and install an air supported fabric structure at the Portland Tennis Center, located at 324 NE 12th Ave. The structure will cover the southern four existing outdoor tennis courts. Bid Date: 5/28/13, 2:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Denice Henshaw, 503-823-2299, denice.henshaw@portlandoregon.gov Addenda: To Be Determined View/Download PDFs Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message. Add Me to Plan Holders List ATTENTION...


