Posts Tagged "12-Furnishings"

Bill Lowe Fire Station 35 Replacement

»Posted on May 23, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of the a new 1-story steel-framed replacement fire station, of approximately 10,400 sf (Base Bid), including site work, utilities, landscaping and related mechanical and electrical work. Total area, including all bid alternates, is approximately 12,520 sf. Additive Alternate No. 1 includes an additional apparatus bay. Additive Alternate No. 2 includes an underground draft tank. Additive Alternate No. 3 includes a storage mezzanine. Bid Date: 6/11/13, 2:30 pm local time Pre-Bid Site Visit:  5/30/13 or 6/4/13, 10:00 am local time - MAP Pre-Bid Meeting: 6/4/13, 3:30 pm local time - Suite 520 MAP Estimated Cost: $3,000,000 - $5,000,000 Price: Purchase Prints or...

read more

OAME UO Straub Hall – Deferred Maintenance & Seismic Upgrade

»Posted on May 21, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: The base project consists of the full renovation and alterations to Straub Hall. There is an additional overlapping phase that includes the demolition of most of the first floor classroom spaces that occupy the courtyard, and the construction of a new classroom addition.  Price: Purchase prints, or free file download Refundable: No Project Contact: Matt Norman, matt.norman@fortisconstruction.com Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room...

read more

OAME Lane Community College Bld 11 Remodel

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: Demolition, Cast-in-Place Concrete, Shotcrete, Precast Architectural Concrete, Unit Masonry, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Cable Railings, Rough Carpentry, Exterior Finish Carpentry, Interior Architectural Woodwork, Bentonite Waterproofing, Traffic Coatings, Water Repellants, Thermal Insulation, Weather Barriers, Standing-Seam Metal Roof Panels, Fiber-Cement Siding and Soffits, EPDM Roofing, Sheet Metal Flashing and Trim, Joint Sealants, Hollow Metal Doors and Frames, Flush Wood Doors, Aluminum Storefronts and Windows, Door Hardware, Glazing, Gypsum Board, Acoustical...

read more

Transportation Maintenance Facility – Bellevue SD – Subcontractors Only – Burke Construction

»Posted on May 14, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of a new 28,426 SF transportation maintenance facility while the existing 13,000 sf building remains in operation until demolished in a later phase. Bid Date: 6/6/13, 2:00 pm PST Pre-Bid Meeting: 5/15/13, 12:00 pm PST - MAP Estimated Cost: $9,500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...

read more

Sea Mar Medical Office Building – Bazan Architects – Sub-Contractors Only

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of the shell and core for a two-story, medical office building with a basement. The building is steel framed with a concrete lateral restraint system. This project is targeting a LEED silver certification. The parking lot for the building is shared with an affordable housing building and is being constructed by another contractor under a separate contract. The interior tenant improvements will be performed by the owner/contractor’s crew. Subcontractor bids include, but are not limited to the following: Excavation and backfill for basement. Utility connections. Foundation and concrete work including shear walls. Waterproofing - foundation and exterior...

read more

Yakima County Jail Facility Upgrade

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of improvements to Yakima County Jail located at 111 North Front Street, Yakima, WA., 98901. Work includes general, security systems, mechanical, plumbing and electrical work in accordance with plans and specifications prepared by DLR Group. A single lump sum bid is requested for all general, special systems, mechanical and electrical work. Bid Date: 6/4/13, 11:00 am PST Mandatory Pre-Bid Walk Through: 5/23/13, 10:00 am PST -  MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Erica Loynd, eloynd@dlrgroup.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List:...

read more

South Ridge Elementary School (Ridgefield, WA)

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work will include site work and first phase construction of a 20,000 SF one-story building to supplement existing Elementary School. Building will consist of six classrooms, learning lab, co-op area, multi-purpose commons with stage/music room, and kitchen. Classroom addition will be wood frame construction with brick veneer/fiber cement panels and plywood shear walls. Multipurpose commons will be CMU with brick veneer and fiber cement panels. Bid Date: varies by Bid Package Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Triplett Wellman Contractors, 503-982-4188, tim@triplettwellman.com Addenda: To Be Determined...

read more

Vehicle Maintenance Facility (Kenai, AK)

»Posted on May 8, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construct a new 17,000 sq ft vehicle maintenance facility. Bid Date: 5/29/13, 10:00 am local time Pre-Bid Meeting: 5/22/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: PublicWorks@ci.kenai.ak.us Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Vehicle Maintenance Facility (Kenai, AK)   Eric’sons Trench Drain – (Other) Contact: Jason Caneer Address: Eric’sons  574C Industrial Way N Dallas, GA  30132 Contact by: P.8135046145 F. 7705056110 E. jcaneer@eric-sons.com MBE/WBE: No    Seattle Daily Journal of Commerce – (Plan...

read more

Mears Middle School CTE, Store, & Admin Upgrades

»Posted on May 6, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of interior renovation of the Administration area, Career and Technology Education Classroom and the School Store at Mears Middle School. The Administration renovation will allow staff to see all incoming visitors as well as create a direct entrance to the school office. A computer lab will be added within the existing shop as well as improving electrical circuiting and mechanical ventilation. Lastly, the school store will get demolished in its entirety and replaced with a larger store with greater electrical capacity and running water. Bid Date: 5/24/13, 2:00 pm local time Pre-Bid Site Visit: 5/10/13, 4:00 pm local time - MAP Pre-Bid...

read more

Washington Elementary School Additions & Modernization

»Posted on May 3, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Mandatory Walk Through: 5/14/13, 4:00 pm PST – MAP Description: Provide all work and materials to complete all general, temporary facilities, demolition, hazardous material abatement, architectural, civil, landscape, structural, mechanical and electrical work under a single general contract for the construction of Washington Elementary School Additions and Modernization, located at 3701 N 26th St, Tacoma, Washington, including site work therefore, for Tacoma School District No. 10, all as shown and described in the Contract Documents prepared by BLRB Architects. Estimated Project Value: $18,200,000 Price: $200 deposit, or free file download...

read more

PCC BP4B – Student Center (Portland Community College)

»Posted on May 3, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Pre-Bid Meeting: 5/7/13, 9:00 am PST – Large Conference Room, MAP Description: Numerous bid items, including: Metals, Drywall, Architectural Woodwork, Openings, Overhead Coiling Doors, Folding Fire Doors, Interior All-Glass Entrances, Storefronts and Glazing, Tiling, Flooring, Painting, Specialties, Toilet Compartments, Operable Folding Panel Partitions, Food Equipment – see RFP/Specs for complete description. Price: Purchase prints, or free file download Refundable: No Project Contact: Mark Matthews, mark@pacificmarkconstruction.com Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download...

read more

Remodel at the CWI Nampa Campus Academic Building-Chemistry Lab

»Posted on May 1, 2013 in Idaho, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Remodel of existing third floor art classroom, alcove, and art storage room into a chemistry lab with Chemistry Office, Chemistry Storage, and Chemistry Storage/Prep Rooms. The existing building is IBC Type II-A Construction, and no additional area is being added to the facility. The area of the Remodel is approximately 1745 sf. The Scope of the work includes demolition; cutting and patching; structural steel; plastic-laminate-faced architectural cabinets; roof patching; patching of existing SFRM; joint sealants; doors and frames; door hardware; exterior and interior painting; high-performance concrete floor finish; interior finishes; specialties;...

read more

Fire Station 20 (City of Seattle)

»Posted on Apr 30, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The scope of this project includes the construction of a new City of Seattle Fire Station 20 of approximately 10,000 gsf designed to meet LEED Platinum requirements. Site demolition includes some utilities, landscaping, trees, rockery, concrete retaining walls, pavement, walkways, paths and stairs. Building demolition includes the removal of (2) existing structures; a vacant 2-story commercial structure and a vacant 1-story former dry cleaning structure. Demolition includes remediation of hazardous materials including asbestos, lead, PCB and Mercury and removal of any unknown subsurface tanks or structures. Site work includes but is not limited to the following: SDOT...

read more

Mat-Su Day School

»Posted on Apr 25, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Matanuska-Susitna Borough is soliciting bids from qualified contractors to provide labor, equipment and material to construct the new Mat-Su Day School at 3901 E. Bogard Rd in Wasilla Alaska. The school is approximately 21,500 SF housing K-12 students consisting of ten classrooms, multipurpose room, administrative areas, parking lots, access roads, field, and playground. Contractors will be responsible to construct the facility per the drawings and specifications provided in the bid documents. Bid Date: 5/20/13, 3:00 pm local time Pre-Bid Meeting: 5/2/13, 10:00 am local time - P2 Purchasing Conference Room MAP Price: Purchase Prints or Free File Download...

read more

Valley Pathways School Construction

»Posted on Apr 25, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Work includes construction of a new single story school of approximately 46,475 square feet with one 2nd level fan room as identified in the contract specifications and drawings. Bid Date: 5/22/13, 3:30 pm local time Pre-Bid Meeting: 5/9/13, 1:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: McCool Carlson Green Architects, (907) 563-8474 Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Valley Pathways School Construction   Seattle Daily Journal of Commerce – (Plan Center) Contact: Ken Elliott Address: 83 Columbia St  Seattle, WA  98104 Contact by:...

read more

Central Peninsula Hospital Obstetrics, Infusion Wound Care Departments Renovations

»Posted on Apr 25, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Approximately 2600 square feet of renovation, window replacement, medical gas system upgrades, and other minor improvements in various locations inside of the Central Peninsula Hospital.  UPDATED Bid Date: 5/8/13, 2:00 pm local time Pre-Bid Meeting: 4/30/13, 10:00 am local time - KPB Conference Room, MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: John Hedges, (907) 262-9657 Addenda: To Be Determined Download PDFsDownload Addendum No. 1Download Addendum No. 2  Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.  ...

read more

Finch Elementary School – Sub Bids Only – Burke Construction Group

»Posted on Apr 25, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Project consists of the modernization of and addition to an historic elementary school in a residential neighborhood next to an actively used neighborhood park. Bid Date: 5/14/13, 2:00 pm PST Pre-Bid Meeting: n/a Project Address: Finch Elementary School, Spokane, WA Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...

read more

Liberty High School Addition & Modernization Phase 3

»Posted on Apr 25, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Liberty High School is an existing educational 9th – 12th grade facility. Phase 3 includes, replacing the existing classrooms and library with 27 new classrooms and library, remodeling 5 existing science classrooms, 4 classrooms, 3 shop spaces, updating the existing gymnasium acoustics, miscellaneous exterior finish improvements and completing 6 tennis courts. The current building construction types include II-A, V-A, and V-B with sprinklers throughout. The new construction will be type V-B and the buildings occupancy will be group E with sprinklers throughout and area separations. Site work includes trenching for utilities, completing parking and driveway paving,...

read more

Sea Mar Des Moines Housing

»Posted on Apr 24, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/24/13, 4:00 pm PST Walk Thru: n/a Description: Construction of a three-story, 43 unit affordable apartment building. The project includes a parking lot for 86 cars and associated storm water work and street improvements adjacent to the site. Price: Purchase prints, or free file download Refundable: No Project Contact: Bazan & Associates Architects, Inc., 425-637-0831 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs Download Addendum No. 1Download Addendum No. 2View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name *...

read more

Building 15 Renovation – Lane Community College

»Posted on Apr 24, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The Project consists of the renovation of the existing Building 15 on Lane Community College, Main Campus located at 4000 East 30th Avenue, Eugene, Oregon. Bid Date: 5/16/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/1/13, 2:00 pm PST - Building 7, Room 212 MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Lana Sadler, (541) 342-8077 Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Building 15 Renovation – Lane Community College   Seattle Daily Journal of Commerce – (Plan Center) Contact: Ken Elliott Address: 83 Columbia St  Seattle, WA  98104 Contact by:...

read more

Pioneer Park

»Posted on Apr 18, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/8/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 4/23/13, 2:30 pm PST – Dryland Training Room, MAP Description: This construction will be carried out under one General Construction Agreement covering the construction work on this project. These Instructions To Bidders amend or supplement any other provisions of the Bidding and Contract Documents. This agreement includes all labor, materials, transportation, equipment and services necessary for and reasonably incidental to the completion of all work in connection with the project described in this Project Manual and all accompanying Drawings. Estimated Project Value: $175,000 Price: Purchase prints, or free file...

read more

Evergreen Elementary School Parking Lot and Site Improvements

»Posted on Apr 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/7/13, 2:00 pm PST Walk Through: 4/23/13, 10:00 am PST – MAP Description: The work of: heating, ventilation, and air conditioning, plumbing as described in RCW 18.106, electrical work as described in RCW 19.28, and any other categories of Work listed on the Subcontractor listing form. Price: $300 deposit for General & Prime Contractors only; otherwise, purchase or free file download Refundable: Yes (if returned within 10 days of bid date) Check To: Bethel School District Project Contact: Steven Storaasli, Erickson-McGovern, (253) 531 -0206 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs Download...

read more

Waterhouse Trail – Merlo TC to NW Laidlaw Rd

»Posted on Apr 16, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/9/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 4/23/13, 1:00 pm PST – MAP Description: Waterhouse Trail Segments 1, 4 , 5, West Union & West Spur – erosion control, trail clearing and grubbing, grading, installation of: drains, traffic warning hardware, fencing and guardrails, CIP concrete, boulder and masonry walls, owner-provided prefabricated bridges, asphalt trails, site furnishings and signs, planting and ROW improvements. Estimated Project Value: $3,785,800 Price: Purchase prints, or free file download Refundable: No Project Contact: Tim Bonnin, 503-629-6305 X 2737, tbonnin@thprd.org Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424...

read more

Lowami Hart Woods Trail

»Posted on Apr 15, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/7/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 4/23/13, 9:30 am PST  - MAP Description: Installation and maintenance of temporary facilities and controls including construction access and staging area(s), safety measures, construction/security fencing, erosion and sediment control, sensitive area protection, and tree protection. Survey and staking of trail alignments, amenity layout, and sensitive area boundary. Site preparation and general site work including demolition, clearing and grubbing, tree removals (as needed), earthwork and excavation, export of materials, grading, sub-base preparation, structural fill, base courses, slope retention, and utility coordination...

read more

Skagit Valley College Reeves Hall

»Posted on Apr 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/30/13, 3:00 pm PST Walk Thru: 4/16/13, 1:00 pm PST – Multi Purpose Room, Cardinal Center MAP Description: Exterior envelope improvements and select interior and exterior improvements at the Skagit Valley College Reeves Hall, including but not necessarily limited to: a. Erect temporary barriers and signage for use during construction. b. Select demolition of exterior and interior elements of the existing building. c. Installation of new masonry veneer and metal siding together with ancillary elements including moisture/vapor barrier, steel bracing and metal stud back-up, furring and insulation. d. Installation of new storefront window units. e. Installation of new...

read more

Pasco School District – Elementary School #13

»Posted on Apr 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: A new 2 story building consisting of 72,000 square feet, including Site Work, Structures, Finishes, Fire Protection, Mechanical, and Electrical work. Bid Date: 5/2/13, 2:00 pm PST Pre-Bid Site Visit: 4/18/13, 2:00 pm PST - 6202 Road 52, MAP Estimated Cost: $16,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Design West Architects, 509-783-2244 Addenda: To Be Determined Download PDFs Download Addendum No. 1Download Addendum No. 2 Download Bid Results Place Print Order View Plan Holders List Plan Holders List: Pasco School District – Elementary School #13   Burke Construction – (General Contractor) Contact:...

read more

PCC, Cascade Campus – Phase 1 – BP4A – Academic Building

»Posted on Apr 9, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. UPDATED Bid Date: 5/8/13, 2:00 pm PST Pre-Bid Meeting: 4/12/13, 9:00 am PST – Room No. 122, MAP Description: The Work includes includes two structures built over a podium of parking which is located below grade. The site is bounded to the north by North Jessup Street, with North Albina Avenue to the east and North Mississippi Avenue to the west. The southern boundary of the site is a property line immediately north of a series of low-rise commercial properties fronting North Killingsworth Street. Prior to this development the site has been actively used as surface parking by PCC. The underground parking garage will accommodate 210 vehicles. Access ramps to the garage will be...

read more

PPS Wilson High School Reroof and Accessibility Improvements

»Posted on Apr 9, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 4/24/13, 2:00 pm PST Mandatory Pre-Bid Walk-Through: 4/10/13, 2:30 pm PST – MAP Description: Remove all existing roofing materials to the deck substrate. Provide new roofing consisting of insulation and SBS roofing materials. The insulation R-value varies in different roof areas. Make interior and exterior improvements at the north entry to facilitate accessibility improvements. Replace existing roof top mechanical units. Install overflow drains at roof areas without overflow protection. Install fall protection devices. Modify lights and cabinets at Classroom 141. Repair sinkhole repair at tennis court. Provide seismic stability work at Gym roof. Estimated Project...

read more

PW13-0188F Marine Security Operations Center – City of Tacoma (Fire Station 5)

»Posted on Apr 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/7/13, 11:00 am PST Walk Thru: 4/18/13, 10:00 am PST – Room 708 MAP Project Scope: The project will provide improvements to the Marine Security Operations Center (MSOC), located at 3301 Ruston Way, Tacoma. WA. Major components of the project include: Removal of a portion of the existing pier and piles, Installation of a new float system and gangway for moorage of emergency service vessels. Structural improvements to the existing building and pier structure, and remodel of the station for joint public safety use. Addition of a new upland apparatus bay and site improvements for an emergency service vehicle. Estimated Project Value: $3,040,000 Price: Purchase prints,...

read more

Gladys Wood Elementary School Building Upgrades

»Posted on Apr 5, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: See plans & specs for complete description. Bid Date: 4/25/13, 2:00 pm PST Pre-Bid Site Visit: 4/10/13, 4:00 pm PST - MAP Pre-Bid Meeting: 4/11/13, 10:00 am PST - MAP Estimated Cost: $500,000 - $1,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Purchasing@asdk12.org Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest Contractors Network (NWCN) is not liable for the Contract Posts and provides these...

read more