Posts Tagged "08-Openings"

Consolidated Car Rental Facility – Medford Airport

»Posted on May 24, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of a 9,050 square foot vehicle wash and light maintenance building, associated site improvements, and (2) canopies over the existing fueling station. Bid Date: 6/13/13, 2:00 pm PST Pre-Bid Meeting: 6/3/13, 10:30 am PST - Conference Room B MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Brian Westerhout, 541-772-3000, brian@gwearch.com Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest Contractors...

read more

New Market West (Home Forward)

»Posted on May 23, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: The New Market Annex building is the administrative headquarters of Home Forward. The building is an historic six story structure located at the intersection of SW 2nd Avenue and Ash Street in downtown Portland. This project will improve building occupant safety, energy efficiency and water efficiency. Work includes minor architectural improvements and upgrades to mechanical, electrical, plumbing and conveyance systems. Home Forward operations will continue throughout construction, therefore most work undertaken through this contract will be completed on weekends and weekdays between the hours of 4:30PM and 7:30AM....

read more

Bill Lowe Fire Station 35 Replacement

»Posted on May 23, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of the a new 1-story steel-framed replacement fire station, of approximately 10,400 sf (Base Bid), including site work, utilities, landscaping and related mechanical and electrical work. Total area, including all bid alternates, is approximately 12,520 sf. Additive Alternate No. 1 includes an additional apparatus bay. Additive Alternate No. 2 includes an underground draft tank. Additive Alternate No. 3 includes a storage mezzanine. Bid Date: 6/11/13, 2:30 pm local time Pre-Bid Site Visit:  5/30/13 or 6/4/13, 10:00 am local time - MAP Pre-Bid Meeting: 6/4/13, 3:30 pm local time - Suite 520 MAP Estimated Cost: $3,000,000 - $5,000,000 Price: Purchase Prints or...

read more

Municipal Court Renovation Project

»Posted on May 22, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The improvement consists of: asbestos containing materials abatement, mold remediation, demolition, mechanical equipment replacement, roofing replacement, carpentry, wall and floor finishes and other minor tasks as specified. Bid Date: 6/13/13, 11:00 am PST Pre-Bid Meeting: 5/29/13, 10:00 am PST - MAP Estimated Cost: $55,000-$65,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: bids@cob.org Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Municipal Court Renovation Project   Tri-City Construction Council – (Plan Center) Contact: Shannon Merriman Address: 20 E Kennewick Ave ...

read more

Granite Falls Libraries Parking Lot Expansion

»Posted on May 22, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/6/13, 2:00 pm PST Walk Thru: 5/29/13, 1:00 pm PST – MAP Description: Expansion to the existing parking lot together with associated civil and electrical work, sealing/recoating/restriping of the existing parking lot, and a new dumpster enclosure and added louvers at the existing mechanical enclosure. Estimated Project Value: $150,000-$165,000 Price: Purchase prints, or free file download Refundable: No Project Contact: Karen Kramer, (360) 651-7012, kkramer@sno-isle.org Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This...

read more

I-5 NE 179th St to N Fork Lewis River Br Vic Paving (WSDOT)

»Posted on May 21, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: n/a Description: The improvement of 13.57 miles of I-5, MP 9.51 to 19.46 northbound and MP 18.21 to 14.59 southbound, in Clark County, WA – by planing bituminous pavement, placing HMA inlay, pavement repair, installing pavement markings and traffic control. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Leon Winger, (360) 905-1500, swVanc@wsdot.wa.gov Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of Record is...

read more

I-5 Carpenter Rd Vic Stormwater Retrofit (WSDOT)

»Posted on May 21, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/5/13, 11:00 am PST Walk Thru: n/a Description: The improvement of I-5, MP 110.59 to 110.76, in Thurston County, by clearing & grubbing, constructing bio-infiltration swales, drainage pipes, grate inlet, and ditches, installing guardrail, placing compost, seeding, and mulching, and traffic control. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Dennis Engel, (360) 570-6750, EngelD@wsdot.wa.gov Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of...

read more

NCR Sign Update 2013 (WSDOT)

»Posted on May 21, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: n/a Description: The improvement of multiple state routes in Adams and Grant Counties by permanent signing and linear delineation system. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Kevin Waligorski, (509) 667-2860 Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of Record is posted at the WSDOT Website under the Proposal/Plan Holders Lists. You must order plans & specs from the state to be on this plan Holders List....

read more

OAME UO Straub Hall – Deferred Maintenance & Seismic Upgrade

»Posted on May 21, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: The base project consists of the full renovation and alterations to Straub Hall. There is an additional overlapping phase that includes the demolition of most of the first floor classroom spaces that occupy the courtyard, and the construction of a new classroom addition.  Price: Purchase prints, or free file download Refundable: No Project Contact: Matt Norman, matt.norman@fortisconstruction.com Addenda: To Be Determined Project Hosted by: ARC-Portland (503) 227-3424 View / Order Documents Download PDFs View Plan Holders List Add This Project to my Private Room Private Room Option: Add This project to a Private Room...

read more

US 395 NSC 2013 Demo 1 (WSDOT)

»Posted on May 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: 5/22/13, 9:00 am PST – MAP Description: The improvement of WSDOT owned properties within the City of Spokane at 115 S Ray, 203 S Green, 3708 E 3rd Avenue, 3723 E 4th venue, 3808 E 3rd Avenue, 3812 E 3rd Avenue, 4048 E 3rd Avenue, 461 6 E 4m Avenue, 511 9 E 5′h Avenue, 411 S McKinnon, 404 S Koren, 3628 E 3″ Avenue, 4120 E 3rd Avenue, 2210 E 3rd Avenue, 3709 E 4th Avenue and by abatement of asbestos materials, removal and disposal of buildings and contents, and removal of fencing. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Larry Larson, (509) 324-6091, LARSOLR@wsdot.wa.gov Addenda: To Be...

read more

US 2 Et Al 2013 Statewide Durable Striping (WSDOT)

»Posted on May 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/5/13, 11:00 am PST Walk Thru: n/a Description: Durable striping in the six WSDOT regions of Washington state. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Jeff Minnick, (509) 577-1810 Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of Record is posted at the WSDOT Website under the Proposal/Plan Holders Lists. You must order plans & specs from the state to be on this plan Holders List. Project Update Notification If you would like to be...

read more

Olympic College International Student Services Hazelwood Library Renovation

»Posted on May 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Revised Bid Date: 6/11/13, 3:00 pm PST Revised Walk Thru: 6/4/13, 10:00 am PST – Second Floor Conference Room, Connolly Facilities Service Building MAP Description: Interior renovation of a portion of the media center on the first floor of the existing Hazelwood Library. Estimated Project Value: $42,480 – $47,200 Price: $75 deposit, or free file download Refundable: Yes (if returned within 7 days of bid date) Check To: Rice Fergus Miller Architecture & Planning Project Contact: Ronald Easterday, (360) 377-8773, reasterday@rfmarch.com Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFsDownload Addendum No. 1...

read more

Montesano High School Grandstand Replacement

»Posted on May 17, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 6/4/13, 2:00 pm PST Walk Thru: 5/21/13, 1:00 pm PST – Montesano District Board Room, MAP Description: The Scope of Work is to replace the original grandstand destroyed by fire. The new grandstand will accommodate approximately 1,250 spectators, and include restrooms, storage and elevated press box. The structure consists of concrete foundations, steel superstructure, pre-cast concrete risers, glu-laminated wood roof and wood infill walls. Price: $100 deposit, or free file download Refundable: Yes Check To: Montesano School District Project Contact: Kris Stamon, (253) 383-3084 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order...

read more

CWU Roofing Replacement at Quigley Hall & Old Heating Plant

»Posted on May 16, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/30/13, 11:00 am PST Walk Thru: 5/21/13, 10:30 am PST - Room 116, Jongeward Plant Services Building,  MAP Description:  The Work at Quigley Hall consists of, but is not necessarily limited to the following: 1. Remove existing 3-tab asphaltic shingle roofing system, including underlayment, metal flashing, and areas of copper roofing, organic growth, and debris. Existing materials are nailed/stapled to an existing sloped plywood deck. 2. Remove existing skylights, extend curbs, infill existing sundeck with new framings and deck, 3. Clean substrate deck, and other materials to which new roofing system is applied, to the satisfaction of the new roofing system manufacturer...

read more

South Granite Avenue Improvement Project – Phase III (Gray & Osborne)

»Posted on May 15, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This Contract provides for the improvements of approximately 1,000 lineal feet of South Granite Avenue from the Southerly City limits to Wallace Street. The work includes, but is not limited to, excavation, pavement removal, grading, compaction, installation of concrete curbs, gutters, pervious concrete sidewalks, asphalt pavement, storm and water improvements, pavement markings, surface restoration, traffic control and other work all in accordance with the attached Contract Plans, these Special Provisions and the Standard Specifications. Bid Date: 5/28/13, 1:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $690,000 Price: Purchase Prints or Free File Download...

read more

OAME Lane Community College Bld 11 Remodel

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Pre-Bid Meeting: n/a Description: Demolition, Cast-in-Place Concrete, Shotcrete, Precast Architectural Concrete, Unit Masonry, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Cable Railings, Rough Carpentry, Exterior Finish Carpentry, Interior Architectural Woodwork, Bentonite Waterproofing, Traffic Coatings, Water Repellants, Thermal Insulation, Weather Barriers, Standing-Seam Metal Roof Panels, Fiber-Cement Siding and Soffits, EPDM Roofing, Sheet Metal Flashing and Trim, Joint Sealants, Hollow Metal Doors and Frames, Flush Wood Doors, Aluminum Storefronts and Windows, Door Hardware, Glazing, Gypsum Board, Acoustical...

read more

Transportation Maintenance Facility – Bellevue SD – Subcontractors Only – Burke Construction

»Posted on May 14, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of a new 28,426 SF transportation maintenance facility while the existing 13,000 sf building remains in operation until demolished in a later phase. Bid Date: 6/6/13, 2:00 pm PST Pre-Bid Meeting: 5/15/13, 12:00 pm PST - MAP Estimated Cost: $9,500,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Nancy Ortiz, (509) 795-5885, nortiz@burkecgi.com Addenda: To Be Determined Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to Plan Holders List ATTENTION CONTRACTORS: Northwest...

read more

Expansion of the Pfriem Brewing Facility

»Posted on May 14, 2013 in Oregon, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work includes build out of approximately 3,683 sq ft of warehouse space, expansion of 2 existing restrooms and new exterior work to include modifications to the existing parking lot, relocating 2 Van Accessible parking stalls, building a new outdoor seating area, new storefront glazing and entry door, new exterior canopy as noted on contract documents. Bid Date: 5/30/13, 2:00 pm PST Mandatory Pre-Bid Meeting: 5/17/13, 2:00 pm PST - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: (503) 227-8100, garyh@orangewallstudios.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List:...

read more

2013 AAC/TIB North 105th Street and North Northgate Way – Rebid

»Posted on May 13, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Full depth pavement reconstruction of the curb side lanes, grind and overlay of the center lanes including pavement base repair, new 5’ minimum wide sidewalks both sides of the street, drainage collection and conveyance, drainage flow control and water quality treatment, crosswalk improvements, new channelization, upgraded curb ramps, curbs, street lighting, signals and ITS work including push button upgrades, loops, advance detection, CCTV and LPR cameras and Dynamic Message Signs. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: n/a Estimated Cost: $9,200,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: Miguel Beltran,...

read more

City Center Reservoir – Ilwaco (Gray & Osborne)

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work under this Contract includes the demolition of the existing 250,000-gallon wood reservoir and portions of existing piping. Following demolition, the project includes sitework and construction of a new 500,000-gallon glass-lined bolted steel reservoir, site piping, electrical and telemetry, site restoration and all associated work as shown on the Plans and described in the Specifications. Bid Date: 5/29/13, 2:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Adam Miller, (206) 284-0860, grayosborne@g-o.com Addenda: To Be Determined Download PDFsDownload Addendum No. 1     Place Print Order View Plan...

read more

Indian Creek Reservoir (Gray & Osborne)

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: The work shall consist of construction of the Indian Creek reservoir including sitework, site piping, a 159,000-gallon concrete reservoir, electrical and telemetry, site restoration and all associated work as shown on the Plans and described in the specifications. Bid Date: 5/29/13, 1:00 pm PST Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Adam Miller, (206) 284-0860, grayosborne@g-o.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List No Plan Holders have been added to this project yet…but you could be the first by filling out the form below this message.   Add Me to...

read more

Sea Mar Medical Office Building – Bazan Architects – Sub-Contractors Only

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construction of the shell and core for a two-story, medical office building with a basement. The building is steel framed with a concrete lateral restraint system. This project is targeting a LEED silver certification. The parking lot for the building is shared with an affordable housing building and is being constructed by another contractor under a separate contract. The interior tenant improvements will be performed by the owner/contractor’s crew. Subcontractor bids include, but are not limited to the following: Excavation and backfill for basement. Utility connections. Foundation and concrete work including shear walls. Waterproofing - foundation and exterior...

read more

US 101 Purdy Canyon Vic. Slide Stabilized Scope (WSDOT)

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/22/13, 11:00 am PST Walk Through: n/a Description: The improvement of US 101 in Mason County, MP 339.85 to MP 340.71 by slope flattening to reduce or eliminate the rock fall potential by clearing & grubbing, roadway excavation incl. haul, seeding, fertilizing, and mulching, planting, temporary drainage, erosion and sediment control, and temporary traffic control. Price: Purchase Prints or Free File Download Refundable: No Project Contact: Dennis Engel, (360) 570-6752, EngelD@wsdot.wa.gov Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company...

read more

SR 20 Spur Friday Harbor Ferry Terminal Transfer Span Overlay (WSDOT)

»Posted on May 10, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/22/13, 11:00 am PST Walk Thru: n/a Description: The improvement of the Friday Harbor Ferry Terminal, in San Juan County, by overlaying the transfer span. Price: Purchase Prints or Free File Download Refundable: No Project Contact: John Callahan, (206) 515-3755, Callajo@wsdot.wa.gov Addenda: To Be Determined Host: ARC-Seattle (206) 622-6000 View/Download PDFs Add This Project to my Private Room Private Room Option: Add This project to a Private Room Company Name * Contact Name * Phone * Email * Notes The Plan Holders List of Record is posted at the WSDOT Website under the Proposal/Plan Holders Lists. You must order plans & specs from the state to be on this plan...

read more

Seattle Municipal Tower (SMT) Glass Roof Improvement

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Glass Roof Renovation at Seattle Municipal Tower floors 58 to 62, including but not limited to:a. Removal of existing elastomeric sealant at all vertical mullion caps. b. Removal and reinstallation of existing mullion caps throughout. c. Renovation of pressure plates and replacement of gaskets. d. Installation of elastomeric sealant and pre-formed silicon sealant renovations. 2. High Roof Gutter Assembly Renovation at Seattle Municipal Tower floor 58, including but not limited to: a. Surface prep and cementitious overlay at two existing concrete gutters. b. Replacement of sheet metal flashing and sealant renovation. c. Replacement of drain covers and flashing membrane....

read more

Yakima County Jail Facility Upgrade

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: This project consists of improvements to Yakima County Jail located at 111 North Front Street, Yakima, WA., 98901. Work includes general, security systems, mechanical, plumbing and electrical work in accordance with plans and specifications prepared by DLR Group. A single lump sum bid is requested for all general, special systems, mechanical and electrical work. Bid Date: 6/4/13, 11:00 am PST Mandatory Pre-Bid Walk Through: 5/23/13, 10:00 am PST -  MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: Erica Loynd, eloynd@dlrgroup.com Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List:...

read more

Maplewood Hts ES Re-roof

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Bid Date: 5/23/13, 2:00 pm PST Walk Thru: 5/16/13, 2:00 pm PST – MAP Description: The replacement of existing asphalt shingle & built-up roofing, substrate & insulation as necessary, gutters, flashings, and downspouts. Provide new fall protection. Work also includes modifications to existing finishes to fit new work with the existing building. Price: $50 deposit, or free file download Refundable: Yes (if returned within 10 days of bid date) Check To: Renton School District Project Contact: Heidi Deaver, (206) 628-3137 Addenda: To Be Determined Project Hosted by: ARC-Seattle (206) 622-6000 View / Order Documents Download PDFs Download Addendum No. 1Download Addendum...

read more

South Ridge Elementary School (Ridgefield, WA)

»Posted on May 9, 2013 in Public, Washington

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Work will include site work and first phase construction of a 20,000 SF one-story building to supplement existing Elementary School. Building will consist of six classrooms, learning lab, co-op area, multi-purpose commons with stage/music room, and kitchen. Classroom addition will be wood frame construction with brick veneer/fiber cement panels and plywood shear walls. Multipurpose commons will be CMU with brick veneer and fiber cement panels. Bid Date: varies by Bid Package Pre-Bid Meeting: n/a Price: Purchase Prints or Free File Download Refundable: No Project Contact: Triplett Wellman Contractors, 503-982-4188, tim@triplettwellman.com Addenda: To Be Determined...

read more

Sand and Pipe Storage Buildings

»Posted on May 8, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Consisting of one each new sand storage building and one each new pipe storage building including all structural, mechanical, electrical, civil work associated with the project and other related work. Bid Date: 5/22/13, 3:00 pm local time Pre-Bid Site Visit: 5/13/13, 2:00 pm local time or 5/14/13, 10:00 am local time - 8501 Hesterburg Rd, MAP Pre-Bid Meeting: 5/14/13, 1:30 pm local time - MAP Estimated Cost: $500,000 - $1,000,000 Price: Purchase Prints or Free File Download Refundable: No Project Contact: wwpur@muni.org Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Sand and Pipe Storage Buildings  ...

read more

Vehicle Maintenance Facility (Kenai, AK)

»Posted on May 8, 2013 in Alaska, Public

Follow us on Twitter or like us on Facebook to be alerted when addenda are posted. Description: Construct a new 17,000 sq ft vehicle maintenance facility. Bid Date: 5/29/13, 10:00 am local time Pre-Bid Meeting: 5/22/13, 2:00 pm local time - MAP Price: Purchase Prints or Free File Download Refundable: No Project Contact: PublicWorks@ci.kenai.ak.us Addenda: To Be Determined View/Download PDFs   Place Print Order View Plan Holders List Plan Holders List: Vehicle Maintenance Facility (Kenai, AK)   Eric’sons Trench Drain – (Other) Contact: Jason Caneer Address: Eric’sons  574C Industrial Way N Dallas, GA  30132 Contact by: P.8135046145 F. 7705056110 E. jcaneer@eric-sons.com MBE/WBE: No    Seattle Daily Journal of Commerce – (Plan...

read more